Limestone Driveway. 20-25yards

I have to give an estimate on a limestone driveway, he wants the old stuff removed and the new stuff put in. it'd be between 20 and 25 yards. First off, what would work best. Im thinking a bobcat and then either have my buddy bring in his 5yard dump... or I could possibly rent one of those big canisiters from the garbage co.

I like the idea of just renting the big canister from the garbage co, because that way I dont have to wait for my buddy to get back from the dump site.

howexactly do I go about approaching this... how much of the old stuff do I take out? all the way to the dirt underneath? and do I need to put some kind of eding in to hold it. also, do I need to compact it or anything? I might end up passing on this job, but It might be worth it once I read up on it... I dont think it should be that hard with the right tools. Thanks guys.
Reply With Quote
  #2  
Old 04-06-2005, 08:04 PM
Scenic Lawnscape's Avatar
Scenic Lawnscape Scenic Lawnscape is offline
LawnSite Senior Member
 
Join Date: Jan 2004
Location: Clinton Township,MI
Posts: 288
Mark, this a good size job in the sense that you will have to take up the old limestone and then take another 3 or 4 inchs of dirt out , so you can get a nice flat surface, and then you put down a weed barrier, and then a base. Then you put in the lime stone. There is going to be alot of removal and the big dumpsters are not really ment for that kind of removal, but to each is there own. Let me know what happens
Reply With Quote
  #3  
Old 04-07-2005, 01:06 AM
spoolinaround's Avatar
spoolinaround spoolinaround is offline
LawnSite Senior Member
 
Join Date: Jul 2003
Location: Toledo Ohio,Home of Tony Packos
Posts: 332
Quote:
Originally Posted by topgunlandscaping
Mark, this a good size job in the sense that you will have to take up the old limestone and then take another 3 or 4 inchs of dirt out , so you can get a nice flat surface, and then you put down a weed barrier, and then a base. Then you put in the lime stone. There is going to be alot of removal and the big dumpsters are not really ment for that kind of removal, but to each is there own. Let me know what happens
if you are laying down screenings then I dont see the weed fabric being a big deal, limestone screenings will pack down almost as hard as cement

just as a fyi you cannot load a roll off full to the top with gravel, they will tripple the cost of the container as a overweight fee

I tore out our driveway to save a grand and loaded up a 40 yard rolloff with all the concrete, it was packed almost to the top, they charged me $650 to haul it off
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 11:18 PM.

Page generated in 0.06748 seconds with 9 queries