Register free!
Search
 
     

The Green Industry's Resource Center


Click for Weather
Reply
 
Thread Tools Display Modes
  #31  
Old 04-15-2014, 10:00 PM
whiffyspark whiffyspark is online now
LawnSite Platinum Member
 
Join Date: Jul 2011
Location: Chesapeake beach
Posts: 4,699
Quote:
Originally Posted by windflower View Post
That job I had lined up just cancelled. Somebody is going to blow it in for $45 a yard, $10 bucks over retail.
That's typical for blower truck.

That usually doesn't include the mulch, though
Posted via Mobile Device
Reply With Quote
  #32  
Old 04-15-2014, 10:06 PM
windflower windflower is offline
LawnSite Senior Member
 
Join Date: Feb 2013
Location: wilmington nc
Posts: 659
This does include the mulch.
Reply With Quote
  #33  
Old 04-15-2014, 10:13 PM
whiffyspark whiffyspark is online now
LawnSite Platinum Member
 
Join Date: Jul 2011
Location: Chesapeake beach
Posts: 4,699
Quote:
Originally Posted by windflower View Post
This does include the mulch.
They must have more in the area that day. They'll be in an out and about an hour.

Trailer units do about 15 an hour. Trucks about triple that. They haul 30-70 yards a trip
Posted via Mobile Device
Reply With Quote
  #34  
Old 04-15-2014, 10:20 PM
PerfectEarth's Avatar
PerfectEarth PerfectEarth is offline
LawnSite Bronze Member
 
Join Date: Mar 2007
Location: Louisville, Kentucky
Posts: 1,671
These threads are always so entertaining.

It seems to me that everyone just shows up and starts throwing mulch into the landscape beds.

Our typical mulch job, everyday, requires 10 job tasks OTHER than just laying the actual mulch.
- Edging beds by hand
- Cleaning out bed debris/leaves, etc
- Weeding, clean-up of last years perennial growth
- TRIMMING! (Roses, boxwoods, hydrangea, etc etc etc!)
- Fertilizing the beds, pre-m…
- Hauling off debris, picking up materials…

…and so on. So, this "per yard" price thing for mulch has always baffled me. No two properties are the same and all have different job tasks to include in your time.

It could take us 2 hours to lay 8 yards of mulch on simple property "A"… while 8 yards may take 5.5 hours on complex property "B"…. you can't price per cu. yd. installed there. You will obviously loose $$

You have to take the entire job into account and the TIME you estimate it takes to get it done. NOT mulch quantity.
__________________
--Specializing in Professional Landscape Installations and Enhancements--

www.PerfectEarthLandscape.com

Follow my updates and pictures on Facebook and LawnSite
Reply With Quote
  #35  
Old 04-15-2014, 10:23 PM
PLLandscape PLLandscape is offline
LawnSite Senior Member
 
Join Date: Aug 2013
Location: Western New York
Posts: 250
Truck like that needs to be kept BUSY to justify having it. At least that's what I've heard from those who own them. But when you can put down 10-15 yards/hour, you can do a ton of mulch. If you own one of those you're buying mulch directly from a supplier by the 1000's of yards at a dirt cheap price. That truck can probably do $200-300/hr.
Posted via Mobile Device
Reply With Quote
  #36  
Old 04-15-2014, 10:24 PM
PLLandscape PLLandscape is offline
LawnSite Senior Member
 
Join Date: Aug 2013
Location: Western New York
Posts: 250
Quote:
Originally Posted by PerfectEarth View Post
These threads are always so entertaining.

It seems to me that everyone just shows up and starts throwing mulch into the landscape beds.

Our typical mulch job, everyday, requires 10 job tasks OTHER than just laying the actual mulch.
- Edging beds by hand
- Cleaning out bed debris/leaves, etc
- Weeding, clean-up of last years perennial growth
- TRIMMING! (Roses, boxwoods, hydrangea, etc etc etc!)
- Fertilizing the beds, pre-m…
- Hauling off debris, picking up materials…

…and so on. So, this "per yard" price thing for mulch has always baffled me. No two properties are the same and all have different job tasks to include in your time.

It could take us 2 hours to lay 8 yards of mulch on simple property "A"… while 8 yards may take 5.5 hours on complex property "B"…. you can't price per cu. yd. installed there. You will obviously loose $$

You have to take the entire job into account and the TIME you estimate it takes to get it done. NOT mulch quantity.

You and I are COMPLETELY on the same page. I've never done a mulch only job...let alone price per yard.
Posted via Mobile Device
Reply With Quote
  #37  
Old 04-15-2014, 10:32 PM
PerfectEarth's Avatar
PerfectEarth PerfectEarth is offline
LawnSite Bronze Member
 
Join Date: Mar 2007
Location: Louisville, Kentucky
Posts: 1,671
Quote:
Originally Posted by PLLandscape View Post
You and I are COMPLETELY on the same page. I've never done a mulch only job...let alone price per yard.
Posted via Mobile Device
Right!? Sometimes I don't even get to the supplier to load up mulch until 1:00 pm because we've spent 4 hours prepping beds/plants and hauling off edgings and debris.
__________________
--Specializing in Professional Landscape Installations and Enhancements--

www.PerfectEarthLandscape.com

Follow my updates and pictures on Facebook and LawnSite
Reply With Quote
  #38  
Old 04-16-2014, 06:44 AM
PLLandscape PLLandscape is offline
LawnSite Senior Member
 
Join Date: Aug 2013
Location: Western New York
Posts: 250
Quote:
Originally Posted by PerfectEarth View Post
Right!? Sometimes I don't even get to the supplier to load up mulch until 1:00 pm because we've spent 4 hours prepping beds/plants and hauling off edgings and debris.
Exactly!

Just like you said, if you have two 8 yard jobs where one you can back up the truck to one large bed and be done rather quickly vs having to wheelbarrow to multiple beds filled with plants and change the same price? One job you're making a killing and the next you're not covering expenses based on a per yard charge.

I did get a chuckle out of this though. On a recent estimate I was told the last guy who had done it before left for a state job. It's a 7 yard mulch job with 400-500ft of edging on about 10 landscape beds for $600. I guess I know why he took the state job. Sounded like a per yard job estimate to me. Oh yea the property was ALL up hill. Fun times with a wheelbarrow.
Posted via Mobile Device
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 10:52 AM.

Page generated in 0.06957 seconds with 9 queries