Register free!
Search
 
     

Click for Weather
Reply
 
Thread Tools Display Modes
  #11  
Old 02-22-2013, 04:56 PM
Impact-Vector Impact-Vector is offline
LawnSite Member
 
Join Date: Sep 2011
Location: Atlanta GA
Posts: 150
Called the city. They said they did not have an engineers sign off on the detention pond.It was specced by the neighborhood architect when the builder developed the area. Since it doesn't hold water. It's not a retention pond..and that's not an auto correct.

I did find one engineer who is interested in the project. Looks like concrete may be the way he wants to go.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 11:05 PM.

Page generated in 0.04743 seconds with 9 queries