#21
|
||||
|
||||
|
Quote:
__________________
Tom Anyone can run equipment, very few can operate. Check out what I do. http://www.youtube.com/user/BobcatNinja2124 Facebook Fan Page http://www.facebook.com/BobcatNINJA The company I work for. http://www.interstatelandscapenh.com/ |
|
#22
|
|||
|
|||
|
Thanks for all the advice. The first job (walkways) came out pretty well adn the customer was ecstatic, but there were a few things I would have done differently, which I did have a chance to do on a smaller patio a few weeks later.
Here are some pics of the before/after's. http://www.facebook.com/photo.php?fb...type=1&theater and the small patio http://www.facebook.com/photo.php?fb...type=1&theater |
|
#23
|
||||
|
||||
|
Quote:
|
|
#24
|
|||
|
|||
|
Yes. There was a two week period of rain when we were trying to finish these jobs back in October, so the poly sand didn't go in until a few weeks later.
As far as doing things different, on the first job I laid the pavers exactly like the pattern guide i downloaded showed, which caused a lot of repetition which I can notice when I walk the paths. On the second time around, I just made sure the shapes fit, and it flew by. I was under the impression that you have to start the arbels in the very center of where you're working and work out from there, so there was a lot of time spent carrying pavers up and down the paths. As we moved along, we realized that as long as you keep the pattern, you can start anywhere. I also brought the plants in a little early and had to be extra careful not to ruin them, causing us to move a little slower. Anxious for another Arbel job so we can tighten things up even more. |
|
#25
|
||||
|
||||
|
Mega Arbel is a great stone, but used in such a way as you have makes me wonder why something different wasn't used or maybe just lay them in a way that requires no cutting. So much time and effort.
|
|
#26
|
||||
|
||||
|
Quote:
![]() .
__________________
"It's You vs. You" "People Throw Rocks At Things That Shine" My Equipment Brag List: -1 CAT hat -16 pairs of Hanes socks (the Heavy Duty model), many with holes. -12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please) -hundreds of t-shirts. Some w/ grease stains, some torn & tattered. -7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em. -1 belt -1 pair of old worn out Nike shoes. |
![]() |