Hey Andrew, how is the 5k treating you? I got a job running a dump site for 5000 loads of engineered fill, so I am looking to purchase a blade soon. I don't want to get something to big and then not be able to use it as often as I would like on other jobs once this is completed. Something like a 5k size would be ideal for some other jobs I have but I'm wondering about the pushing power for knocking over the engineered fill
Posted via Mobile Device |
|
#2542
|
||||
|
||||
|
Did you use the CTL to help move some of the dirt.Kind of hard to carring dirt that far with the a dozer especailly a 6 way blade,plus the dirt looked more like sand.I can't believe you have a dozer,i thought everything had to be done with an excavator.
Glad your learning there other jobs and ways of doing things other then with an excavator.So did you extend the pipe through the dam or just narrow it there???? Looks like hole in dam slope there. |
|
#2543
|
||||
|
||||
|
Sean- for the limited amount of work I have been able to do with the 5K so far I love the machine. Super smooth and responsive to the operator's touch. I did a couple bogs with it and had to knock over 20+ yd loads that were being dropped every 5-10 minutes and the machine had no problem knocking the piles over. For me the 5K is the perfect size machine right now for the bog work and commercial work we are going after.
Construct'O- I only used the CTL to push the piles off the asphalt to build the ramp so that I wouldn't destroy the asphalt with the dozer's grousers. I then used the CTL as a clean up machine at the end of the project. The CTL did not bucket any material on this job. The dozer was used to move all of the material (which was sandy fill) in building that dike. It was a 300' push and I learned long ago the power of slot dozing to move material. The flumes were ordered for me before the project began. I installed the flume before I started backfilling over it. Since the pipe was not long enough to go through the double wide dike, I had to narrow the dike by the flume which is why you see a hole in the dike. The original plan for the dike was to have it only be 10' wide at the top, but the owner wanted me to lose this big pile of fill he had onsite in building the dike so we ended up doubling the width of the dike and had to adjust the grading around the flume to accommodate the change in dike design.
__________________
A.R.Plante Industries, LLC Land & Brush Clearing, Grading & Excavation, Colored Mulch Mfg, Contract Grinding, Cranberry Bog Services, Storm Cleanup, Snow Plowing & Ice Management WWW.ARPLANTE.COM A.R.Plante on Facebook: http://www.facebook.com/home.php#!/p...0670251?ref=ts Check Out Our Videos on YouTube!: http://www.youtube.com/user/arplante...s?feature=mhee |
|
#2544
|
||||
|
||||
|
Nicely done ARP. Glad you were able to put the 5k to work for a while.
__________________
Life summed up by refrigerator magnets: HE WHO DIES WITH THE MOST TOYS WINS OLD RANCHERS NEVER DIE, THEY JUST QUIT HORSIN AROUND |
![]() |
| Bookmarks |
«
Previous Thread
|
Next Thread
»
| Thread Tools | |
| Display Modes | |
|
|












Linear Mode