Sod installation time estimate to complete.

Just a quick questions.

Pretty new to the game but, how long should it take 3 guys to do approx 2000sf of sod installation? Including prep, a 1-2" layer of additional soil for levelling and laying it down etc.. I may need to use a sod cutter to remove old patchy areas that exist as well.

Thanks in advance.
Reply With Quote
  #2  
Old 04-02-2005, 05:11 PM
olderthandirt olderthandirt is offline
LawnSite Platinum Member
 
Join Date: Aug 2001
Location: here
Posts: 4,905
After prep since I have no way of knowing what you have to do or the equipment you have available, it should take 3 guys only a few hrs to lay the sod if its been placed close to the area that needs it.
Reply With Quote
  #3  
Old 04-02-2005, 05:38 PM
AL Inc AL Inc is offline
LawnSite Bronze Member
 
Join Date: Jan 2002
Location: Long Island, NY
Posts: 1,225
Yes, the prep work will take much longer than actually laying the sod.
Reply With Quote
  #4  
Old 04-03-2005, 08:16 AM
scraper69's Avatar
scraper69 scraper69 is offline
LawnSite Senior Member
 
Join Date: Feb 2005
Location: mi
Posts: 478
Plan on a good full day, (8-10) hours - Completed
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 10:40 PM.

Page generated in 0.07199 seconds with 7 queries