Paver work in progress

Here's a job we're currently doing
Reply With Quote
  #2  
Old 06-25-2005, 11:02 PM
MarcusLndscp's Avatar
MarcusLndscp MarcusLndscp is offline
LawnSite Senior Member
 
Join Date: Aug 2004
Location: New England
Posts: 636
Sorry, hit the wrong key and submitted too early. Here's a job we're currently doing. We still have to run a band of pavers around the edge of the octagon and then run 2 small walks from it to the gazebo and to the house and one long walk about 60 feet around to the side of the garage. Nothing's been edged yet and obviously not planted but it will all be done by wednesday so I'll post finish pics then.
Attached Images
         
Reply With Quote
  #3  
Old 06-26-2005, 07:54 AM
bigviclbi bigviclbi is offline
LawnSite Senior Member
 
Join Date: Jan 2005
Location: nj
Posts: 883
Are those pavers wet they look like they have a sheen to them?
Reply With Quote
  #4  
Old 06-26-2005, 08:19 AM
Foz Foz is offline
LawnSite Member
 
Join Date: Mar 2001
Location: Commonwealth of Virginia
Posts: 143
Looks good so far, make sure you post the finished job pics
Reply With Quote
  #5  
Old 06-26-2005, 09:22 AM
RedWingsDet's Avatar
RedWingsDet RedWingsDet is offline
LawnSite Gold Member
 
Join Date: May 2004
Location: Detroit
Posts: 3,562
may I ask what you used to get that level. on an area that broad it doesnt seem like the standard 1/4pipe and 2x4 would be sufficent.
Reply With Quote
  #6  
Old 06-26-2005, 09:37 AM
MarcusLndscp's Avatar
MarcusLndscp MarcusLndscp is offline
LawnSite Senior Member
 
Join Date: Aug 2004
Location: New England
Posts: 636
Yes the pavers are wet.

As far as level goes....all the water sheds in one direction to the left of the gazebo if you're looking at it. To do this we used (3) - 3/4" rigid steel electrical conduit. The O.D. of it is one inch. I layed one in the middle and one on each side then used an 8' screed to screed off the sand. The pipes were shot with a transit to get the grades exact. There is another 35' walkway we completed there already as well I just don't have a finish pic. To screed and lay and cut the octagon took 2 of us about 4 hours.

What is 1/4 pipe?
Reply With Quote
  #7  
Old 06-26-2005, 09:42 AM
AL Inc AL Inc is offline
LawnSite Bronze Member
 
Join Date: Jan 2002
Location: Long Island, NY
Posts: 1,225
Very cool looking, I like it. What type of pavers did you use? Looks a lot like the Anchor Country Manor buff/flash brown combo that I'm using at my house.
Reply With Quote
  #8  
Old 06-26-2005, 10:42 AM
cgland's Avatar
cgland cgland is offline
LawnSite Bronze Member
 
Join Date: Jan 2003
Location: Reading, PA
Posts: 1,931
Marcus - Looks good! I like the octagon. Your cuts look good. Post some more pics when available.

Chris
Reply With Quote
  #9  
Old 06-26-2005, 12:07 PM
MarcusLndscp's Avatar
MarcusLndscp MarcusLndscp is offline
LawnSite Senior Member
 
Join Date: Aug 2004
Location: New England
Posts: 636
The pavers are from Bolduc....first time I've used them. Same concept as say a dublin cobble with 4 sizes. I notice quite a few imperfections with the Bolduc. Quite often one side of the paver will have a big "wart" that is probably the size of a golf ball in diamter or a bit bigger and stands about 1/2" high. The opposite side so far has been usable so not a big deal, you just have to watch for them. Thanks about the cuts CGLand, the good part of doing a pattern like that is you have NO waste if the guy cutting is any good. Whatever chunk was left from the cut you were making you just flip it over and start your next course with it. I think on the octagon which is 15' wide the only waste we had was from the first pie pieces we had to cut between each band. So we only had 16 small corners of a square for waste on that part of the job. The center we made out of a 2" thick piece of dimensional granite and really getting that piece sized and cut properly was the whole key to the rest of the octagon coming out right.
Reply With Quote
  #10  
Old 06-26-2005, 09:30 PM
GreenMonster's Avatar
GreenMonster GreenMonster is offline
LawnSite Silver Member
 
Join Date: Jan 2004
Location: NH
Posts: 2,705
Mark,

Are those the Bolduc Chateau? I use them quite a bit. I had a similar "wart" experience with them for the first time last week. Except, the imperfection in mine was more of a straight line, and not a circle. As you said, they could be flipped over and were fine.

Lookin' good.
__________________
Mark
Green Monster Landscapes

"Blue eyed boy meets a brown eyed girl.... oh oh oh the sweetest thing"
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 11:29 AM.

Page generated in 0.10036 seconds with 8 queries