|
#1
|
|||
|
|||
|
Im looking over a proposal I recieved to have my driveway replaced, and part of the specs mentions paving with 3 inches of "class 2 blacktop." What is class 2 blacktop, in relation to class 1 or 3 or whatever, and would it be suitable for a driveway?
The contractor is providing a 5 year warranty but my concern is that he not use the large aggregate stuff usually reserved for rough bottom course. Thanks in advance for your thoughts on the subject.
__________________
Bill Yesterday is a memory. Tomorrow is a mystery. Right now is your reality. (Thx to GB, RIP) |
|
#2
|
|||
|
|||
|
Bill
I think it is applied in layers like this: Base Coat Binder Top Coat I know that when Pop talks about his days working construction he mentions a 12/6 compaction ratio. He always states that it should be laid out in 12 inch increments and the compacted to 6 inches because thats how the state specs used to read. I will ask him when I see him tomorrow and let you know more then. Good Luck this season! Kris |
|
#3
|
|||
|
|||
|
Kris
When they lay driveway's they usually don't do it in lifts, its usually 6" (3" compacted) and thats it. What you were describing was when building a road.
Bill, your best bet is to call Tomasso Bros. or O&G, etc and ask them what they're giving out for class 2 asphalt. You should be okay though, for your driveway, the fine aggregate would give the best appearance.
__________________
"Guido" TSgt David M. Famiglietti United States Air Force ![]() EarthWorks Professional Outdoor Services North Las Vegas, Nevada earthworks1@cox.net |
|
#4
|
|||
|
|||
|
The most important thing is the base.How much Item 4 is he putting down as a base?
If it was my driveway this is what I would spec Install 8-10 inches of Item 4 as a good base 4-5 inches of basecoat asphalt(binder) 2-3 inches of topcoat asphalt All this should be compacted with at least a 3-5 ton roller,maybe larger if the driveway is new. Good Luck
__________________
Michael J. Nelson, CSP |
|
#5
|
|||
|
|||
|
Sieve size I think
Bill -
By now you probably already checked out the web, but I think that it relates to the amount of aggregate that fits through a certain size sieve. I think that this size is good for driveways because it won't separate easily, but isn't big (1 1/4"+). The finer stuff, like for curbs might be nicer looking, but will crumble when turned on. The binder probably has larger stones and a different aggregate to asphalt ratio. Check out the Asphalt sites, or I found http://www.Tilconde.com had a sieve chart on it but it wasn't formatted very well.
__________________
Phil Soundview Landscape Supply - http://www.soundviewlandscape.com Ivy League Landscaping - http://www.ivyleaguelandscaping.com |
|
#6
|
|||
|
|||
|
I discovered class 2 is 3/4 inch screen aggregate. Fine by me.
The driveway will be 6 inches 1 1/2 inch clear stone, followed by 3 inches process stone, followed by 3 inches compacted to 2 of class 2 blacktop. Pretty standard for residential driveways in this area. Others with this makeup have held up well 10+ years (far back as I checked references).
__________________
Bill Yesterday is a memory. Tomorrow is a mystery. Right now is your reality. (Thx to GB, RIP) |
![]() |
| Bookmarks |
«
Previous Thread
|
Next Thread
»
| Thread Tools | |
| Display Modes | |
|
|













Linear Mode
