Register free!
Search
 
     

Click for Weather
Reply
 
Thread Tools Display Modes
  #1  
Old 01-11-2006, 10:13 PM
BCFLawnLandscape's Avatar
BCFLawnLandscape BCFLawnLandscape is offline
LawnSite Senior Member
 
Join Date: Nov 2005
Location: Trenton, Ohio
Posts: 329
Field Question

Quick Question.... What all goes into prepping an open field for a baseball field? Should we haul in topsoil? Rockhounding is a neccessity I know that but what else should I prepare for? What costs go into something like this, building a field from scratch? What would work best in getting the field level? Are there any plans that have to be drawn up? I'd be creating approx. 3-5 fields. Anyone w/experience on this i'd be glad to listen to your advise. Thanks!
__________________
www.bcflawn.com
info@bcflawn.com

BCF Lawn & Landscape
'05 Chevy 2500HD
'05 Chevy 2500HD Duramax
18' Enclosed Trailer
20' Enclosed Trailer
24' Liberty Gooseneck Bobcat Trailer
18' Landscape Curbing Trailer
60" Cub Commercial Tank
60" Cub Commercial Recon
2 52" Wright Standers
36" Cub Commercial Walk Behind
763 Bobcat
Stihl weedeaters and Blowers
7.5' Meyers Snow Plow
8' Blizzard Snow Plow
10 Foot Snow Box
Reply With Quote
  #2  
Old 01-11-2006, 11:56 PM
out4now's Avatar
out4now out4now is offline
LawnSite Bronze Member
 
Join Date: Aug 2004
Location: AZ
Posts: 1,798
http://www.turface.com/turface/sfm_1.html will give you lots of info. I'll see if I can't dig up some of the old stuff I've got for links to the rest. Baseball can be a PITA. Whats the soil type? You may need to put in drain tiles. I'll look and get back to you. Also check out this site http://www.gmsforsportsfields.com/
Reply With Quote
  #3  
Old 02-01-2006, 02:42 PM
LawnBoyatWork LawnBoyatWork is offline
LawnSite Member
 
Join Date: Jan 2006
Location: ohio
Posts: 24
Field prep.

It is a good idea to add geotextile depending on soil. You should make sure you cut your infield lip out before you fill to much... that will help reduce lip wear as you start usind dragging equipment on the field. If you are installing f oul poles or are thinking about it for the future.. spend the money now so you don't have to try to align everthing as far as basepins and home later... Its very frustrating to deal with ... Apply turface to the top of your field first instead of buying rapid dry by the bag in the future it will help costs over long term.That's all I have for now.
Reply With Quote
  #4  
Old 02-01-2006, 09:06 PM
PurpHaze's Avatar
PurpHaze PurpHaze is offline
LawnSite Fanatic
 
Join Date: Sep 2005
Location: Visalia, CA
Posts: 6,306
[Umpire hat on]Don't maintain a radical slope in the area the plate umpire has to be to call pitches. Bad for backs and easy to trip when busting outa there. Make sure there's no lip along the foul lines. Same reason.[Umpire hat off]

[Irrigator hat on]Pay the extra and put in a manually operated high speed sprinkler system to wet down the skinned infield during pre/post game prep. The $750 spent will be well worth it in saved time.[Irrigator hat off]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump




Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 09:08 AM.

Page generated in 0.07032 seconds with 7 queries