Register free!

Reply
 
Thread Tools   Display Modes
  #1  
Old 04-08-2006, 02:37 PM
NNJLandman NNJLandman is offline
LawnSite Bronze Member
 
Join Date: Mar 2002
Location: North Jersey
Posts: 1,307
Topsoil job

Guys I need some help on this estimate, Im having the most difficult time trying to figure out exactely how much topsoil im going to need, frist I plan on leaving the yard off with an excavator dozer blade and using fill dirt or sand and going over top with 2" of topsoil. Yard is 8-10,000sqft. can someone tell me how much topsoil I will need, thanks.

Jeff
Reply With Quote
  #2  
Old 04-08-2006, 08:37 PM
jpmako's Avatar
jpmako jpmako is offline
LawnSite Senior Member
 
Join Date: Jan 2004
Location: Bergen - Rockland
Posts: 593
Jeff,

To achieve your 2" depth you would need the following

8000 Sqft = 49.4 Yards
9000 Sqft = 55.6 Yards
10000 Sqft = 61.7 Yards

Hope this helps

Jason
Reply With Quote
  #3  
Old 04-08-2006, 08:47 PM
gammon landscaping gammon landscaping is offline
LawnSite Senior Member
 
Join Date: Jan 2006
Location: east tennessee
Posts: 551
one thing you guys might want to remember is that when you messure the inside of a truck that you will get around 16-20 yards(tadem axle dumps) but when you take that material and spread it and it compacts you will only have 10-12 yards max. the reason is that the truck will not be compleatly toped off and that compaction factor. just an fyi
__________________
236 cat slip and slid
245 massy tractor
99 250 power strock ford
agri metal strawblower
more power and hand tools than i haul
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 02:11 AM.

Page generated in 0.06025 seconds with 9 queries