Register free!
Search
 
     

Click for Weather
Reply
 
Thread Tools Display Modes
  #1  
Old 04-26-2006, 09:15 PM
bobbygedd bobbygedd is offline
LawnSite Fanatic
 
Join Date: Nov 2000
Location: NJ
Posts: 10,188
you measure the beds......

ok, client calls for mulching of beds. i like to put a nice 3" layer of mulch. so, you measure, and tell them it's $400 for the mulch, material, delivery, and installed. you tell them 3" deep. the customer says, how about going only 1.5" deep, and charging me $200? seems right, don't it, you're using half as much mulch, why not go, half the price. even if u charge "per yard" and your measurments show that at 3" deep, u need 6 yds. if the customer asks for 1.5" deep, would it be half the price of the 3" deep? yes, no, and why
Reply With Quote
  #2  
Old 04-26-2006, 09:38 PM
ProMo's Avatar
ProMo ProMo is offline
LawnSite Bronze Member
 
Join Date: Mar 2002
Location: Casselberry Florida
Posts: 1,467
It takes me about an hour to clean out my truck and go get the mulch even if its a half a load it still gets the same delivery charge.
Reply With Quote
  #3  
Old 04-26-2006, 09:39 PM
bobbygedd bobbygedd is offline
LawnSite Fanatic
 
Join Date: Nov 2000
Location: NJ
Posts: 10,188
Quote:
Originally Posted by ProMo
It takes me about an hour to clean out my truck and go get the mulch even if its a half a load it still gets the same delivery charge.
wrong answer
Reply With Quote
  #4  
Old 04-26-2006, 09:39 PM
grass-scapes's Avatar
grass-scapes grass-scapes is offline
LawnSite Bronze Member
 
Join Date: Apr 2003
Location: Greensboro NC
Posts: 1,553
Because of your "fixed" cost. Depreciation on your dump truck. Fuel for your dump truck. Travel time to the site. Travel time to get the mulch. Screw off time to waste on lawnsite.
__________________
By the time you can make ends meet....They move the ends.
_________________________
Grass Scapes
Greensboro NC
Reply With Quote
  #5  
Old 04-26-2006, 09:41 PM
daveintoledo's Avatar
daveintoledo daveintoledo is offline
LawnSite Silver Member
 
Join Date: Mar 2005
Location: northwest ohio
Posts: 2,590
because.....

a 1.5 inch bed of mulch will not do its job, it will not retain the moisture properlly, or help with the reduction of weeds...... its just astetic, not functional......3 inches of mulch please......
__________________
owner operator of lawn care, landscaping, and snow removal company
completely legal and insured
7 years in business
6 full time
Reply With Quote
  #6  
Old 04-26-2006, 09:43 PM
bobbygedd bobbygedd is offline
LawnSite Fanatic
 
Join Date: Nov 2000
Location: NJ
Posts: 10,188
wrong, wrong, and wrong. and please jodi, don't answer, you know the answer, cus we discussed it today, while i was doing the job.
Reply With Quote
  #7  
Old 04-26-2006, 09:48 PM
grass-scapes's Avatar
grass-scapes grass-scapes is offline
LawnSite Bronze Member
 
Join Date: Apr 2003
Location: Greensboro NC
Posts: 1,553
It may not be the exact answer you are "fishing" for, but I am correct. Your fixed expenses are the same whether you do one yard or 10

How about you tell us the answer you want so we can worship your highness.
__________________
By the time you can make ends meet....They move the ends.
_________________________
Grass Scapes
Greensboro NC
Reply With Quote
  #8  
Old 04-26-2006, 09:49 PM
Dweezil Dweezil is offline
LawnSite Member
 
Join Date: Mar 2006
Location: Saint Claire Shores, Michigan
Posts: 66
I wouldn't go half just because your using less mulch. It's still going to take the same amount of time to get it there and clean everything up when your done. It's just going to take less time to put all the mulch down, but I wouldn't expect it to take half the time, maybe 3/4 after all is said and done. I could see cutting down the material cost, but labor is going to be about the same either way.

Without seeing the job, I'm going to say tell them $300 instead of $400 depending on how much your labor charge is.
__________________
Mechanic/Asst. Mananger
Renter Center Inc.
rentercenter.20megsfree.com
Reply With Quote
  #9  
Old 04-26-2006, 09:50 PM
sildoc's Avatar
sildoc sildoc is offline
LawnSite Silver Member
 
Join Date: Jun 2003
Location: Eagle Point, Oregon
Posts: 2,716
Now This all depends on how many sq ft you have to go and how far the mulch needs to go from trailer to bed. Do I weed the beds prior to installation or install over sprayed or non sprayed weeds? Is it a regular customer?
I have to get the bark and deliver so there is one price. Installation is another price. Weeding the bed out and making a nice edge on the bed is another. So if they want half the mulch then I still bill for delivery fee and edging and weeding the bed. So in actuality total cost would be more like 325-350. Most will opt for more mulch.
__________________
What ever I do I must do it right!
Reply With Quote
  #10  
Old 04-26-2006, 11:06 PM
gammon landscaping gammon landscaping is offline
LawnSite Senior Member
 
Join Date: Jan 2006
Location: east tennessee
Posts: 551
tell then 375 and tell them that you overhead is alot more than just what the mulch costs, and that you do not preform substandered work.
__________________
236 cat slip and slid
245 massy tractor
99 250 power strock ford
agri metal strawblower
more power and hand tools than i haul
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 07:54 AM.

Page generated in 0.09840 seconds with 7 queries