Quote:
Originally Posted by tthomass View Post
Current job site. Block wall we're building to veneer with stone. Its only going to be about 24" tall as they only want to lessen the slope. I think they may end up going for a little more once we start setting block.

I got a little greedy with the bucket and the excavator pivoted on me. You can get out of just about anything with a bucket on a machine though.
How tall is this wall todd?
Reply With Quote
  #712  
Old 08-17-2009, 06:12 PM
tthomass's Avatar
tthomass tthomass is offline
LawnSite Gold Member
 
Join Date: Jun 2006
Location: N. VA
Posts: 3,431
2' above grade, probably will end up 3' with change order
Reply With Quote
  #713  
Old 08-18-2009, 11:09 PM
tthomass's Avatar
tthomass tthomass is offline
LawnSite Gold Member
 
Join Date: Jun 2006
Location: N. VA
Posts: 3,431
Footer ready to go.......8-10" of concrete, with fiber, rebar and 3500 psi vs 3000
Attached Images
   
Reply With Quote
  #714  
Old 08-18-2009, 11:12 PM
Duffster's Avatar
Duffster Duffster is offline
LawnSite Bronze Member
 
Join Date: Mar 2009
Location: Midwest
Posts: 1,181
Quote:
Originally Posted by tthomass View Post
3500 psi vs 3000
Went all out on that one eh?
__________________


Quote:
Originally Posted by Mark Oomkes
Your argument falls flatter than a 3 day old roadkill squirrel.
Reply With Quote
  #715  
Old 08-18-2009, 11:17 PM
tthomass's Avatar
tthomass tthomass is offline
LawnSite Gold Member
 
Join Date: Jun 2006
Location: N. VA
Posts: 3,431
I used to do 3000 psi up until two jobs ago. I was always taught 3000 is all you need and its what everybody uses really but I look at an extra $4 per yard as very cheap insurance. I also always use fiber ($10 per yard). This footer was only 3 1/4 yards so the additional expense is pretty much nothing and I know my footer is very solid. We'll have another pour here for the second patio and that too will get 3500.
Reply With Quote
  #716  
Old 08-19-2009, 01:39 AM
STL Ponds and Waterfalls's Avatar
STL Ponds and Waterfalls STL Ponds and Waterfalls is offline
LawnSite Bronze Member
 
Join Date: Dec 2006
Location: St.louis MO
Posts: 1,175
How long before you start setting stone?
__________________
St.louis Ponds and Waterfalls
"We bring life to your backyard"
Reply With Quote
  #717  
Old 08-19-2009, 05:53 PM
tthomass's Avatar
tthomass tthomass is offline
LawnSite Gold Member
 
Join Date: Jun 2006
Location: N. VA
Posts: 3,431
Stone will go up Friday or Monday. I may have to cut off early Friday to go pick up something. Stone is just PA fieldstone, 1/2"ish joint + blue stone cap so nothing fancy. I'm pushing my guys on vertical work as the flat work is where it needs to be. I'm working on pulling myself out of the field here and there to take care of other things. Guy #1 is good with doing flat work, not so much on vertical and doesn't like it. Guy #2 has the interest but no the experience. The idea is that in the future I may be there to dig and pour concrete, then leave and let them take care of the flat and vertical work. Should it not catch on quick, I'll be hiring a mason in the spring as I can't do this anymore myself and remain productive with the job and the business. *Crossing fingers* Here's pics from today:
Attached Images
         
Reply With Quote
  #718  
Old 08-19-2009, 05:56 PM
tthomass's Avatar
tthomass tthomass is offline
LawnSite Gold Member
 
Join Date: Jun 2006
Location: N. VA
Posts: 3,431
Between the walls will be PA boulder steppers coming down the hill and patio #2 where the Bobcat is sitting. The small wall is not complete..........we ran short (2) block which were broken on site haha. There's always tomorrow I guess.....

Grade comes up so (3) courses of block are above grade.
Reply With Quote
  #719  
Old 08-19-2009, 06:29 PM
Junior M's Avatar
Junior M Junior M is offline
LawnSite Fanatic
 
Join Date: Jun 2008
Location: South Carolina
Posts: 13,106
Oh my, I hope your washing the mortar off the front of the 190..
__________________
Southeastern Services


Quote:
Originally Posted by bobcat_ron View Post

Just run the god damn sh*t out of the machine and the hell with all the other crap, make money instead of worrying about crap that only accountants think about!
Reply With Quote
  #720  
Old 08-19-2009, 06:36 PM
tthomass's Avatar
tthomass tthomass is offline
LawnSite Gold Member
 
Join Date: Jun 2006
Location: N. VA
Posts: 3,431
Thats from a very late concrete pour......not too happy with that company. Anyway, somehow it was overlooked getting off the Bobcat. It already had some on there and paint just not looking its best anyway because we actually use the machine.....winter project is grinding and painting the Bobcat for a nice face lift. Other than that on the front, the machine is kept clean and very well maintained.

**Something to note. Anyone thinking of using PA field stone for a veneer that hasn't, keep in mind the stone comes very dirty and needs washing off which means more time. I prefer other stones but its the cheapest and sometimes just comes down to using it to meet a budget.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 06:55 AM.

Page generated in 0.09910 seconds with 8 queries