#1
|
||||||
|
||||||
|
2-Wire Systems: wire tracing and servicing
LondonRain brought up some interesting insights that I'd like to explore further before committing my new design to a 2-wire system.
Quote:
Quote:
Quote:
Quote:
Quote:
Quote:
|
|
#2
|
||||
|
||||
|
New field Purp?
Do I understand correctly that the only real advantage in 2 wire is programability and reduction in copper?
__________________
Crayons taste like Purple |
|
#3
|
||||
|
||||
|
Since you only have 2 wires and it must be a continuous wire with no tee-offs in the wire you trace the entire wire path all over the area for every valve not just one valve . Most of the time doubling back the same path since it is continuous wire run or it could be a dead wire at a valve and you are tracing back the same wire again. The field receiver/decoder must be activated for the current to pass through and activate the solenoid, if dead receiver then no solenoid signal, no solenoid activation/coiling and the 521 passes right past. Yes the decoder acts like a isolation valve, no signal no activation of the solenoid. This is a Hit 2 wire system and they are installed in their own boxes with decoder...and another contractor installed the system.
Yes it is a pain trouble shooting. What I end up doing is using my station master and a solenoid then testing the 2 wires between two valve locations, if good move on to the next area. The last time I was out trouble shooing we had a dead wire and since I do not know the exact path of the wires it was a real pain... one of the decoders went bad so it showed a short on the station master when hooded up on the 2 wires, so I had to disconnect decoders until if figured out what was happening...once again just a real pain...
__________________
Good repair jobs aren't cheap. Cheap repair jobs aren't good. Last edited by londonrain; 10-06-2007 at 11:05 AM. |
|
#4
|
||||
|
||||
|
Just curious about new technologies available to us.
Quote:
|
|
#5
|
||||
|
||||
|
Quote:
Guess I'll have to do some more reading to better understand the wiring routing.
|
|
#6
|
||||
|
||||
|
Yes you can tee in. Cut old wires, connect new wires to one end of cut wires and run new wires, double back new wires and connect to the other end of the old cut wires.
__________________
Good repair jobs aren't cheap. Cheap repair jobs aren't good. |
|
#7
|
||||
|
||||
|
You only want one dead end wire path.......
__________________
Good repair jobs aren't cheap. Cheap repair jobs aren't good. |
|
#8
|
||||
|
||||
|
Wiring is one of the most important parts of a 2 wire system..Here is a pic of the connectors Hit supplies with each decoder.
__________________
Good repair jobs aren't cheap. Cheap repair jobs aren't good. |
|
#9
|
||||
|
||||
|
now with the hunter acc you can run up to 6 paths and they you can dead end all you want, at least from what I understand. nothing had to be looped, and you could tee in anywhere you want. i also used the pre braided wire.
|
|
#10
|
||||
|
||||
|
Correct if your controller can run 6 paths you will have 6 dead ends, 1 for each path. The Hit logic 1 has one path only thus 1 dead end path. You will not want 1 path with more than one dead end. With the Hunter 2 wire you connect the decoder on the 2 wire path, then you can run up to 150f of extra wire from decoder to the solenoid. You will not want to tee into the 2 wire and run more of the 2 wire to the solenoid and dead end it.
__________________
Good repair jobs aren't cheap. Cheap repair jobs aren't good. |
![]() |