  #11  
Old 01-02-2008, 02:53 PM
SiteSolutions's Avatar
SiteSolutions SiteSolutions is offline
LawnSite Bronze Member
 
Join Date: Apr 2007
Location: Huntsville, AL
Posts: 1,098
You're talking about that 1" sheet of yellow fiberglass, right?
Reply With Quote
  #12  
Old 01-02-2008, 03:02 PM
SiteSolutions's Avatar
SiteSolutions SiteSolutions is offline
LawnSite Bronze Member
 
Join Date: Apr 2007
Location: Huntsville, AL
Posts: 1,098
Quote:
Originally Posted by tomscreek View Post
well I believe it would be his bad then, so I reckon he'll need to pay for it
I'd agree. Architects should be set up to take responsibility for this stuff, anyhow, like liability insurance or bonding or something.

If he really is over a barrel maybe you could give him a good break on it, especially this time of year, but I would hate to do it for free. Sometimes keeping a good relationship can help out later, but being somebody's b1tc4 / fall guy is just as likely to let the other guy think he can always get away with treating you bad. Definitely need to think about it and size up the character of the architect.

I love to keep customers happy but some people want the moon for one dollar over cost...
Reply With Quote
  #13  
Old 01-02-2008, 03:03 PM
clyde's Avatar
clyde clyde is offline
LawnSite Senior Member
 
Join Date: May 2002
Location: hattiesburg,ms
Posts: 331
well what happened was We spoke about it on Thurs 2weeks b4 xmas
then the next Weds i got started !!! thats an entire week for him to think about it. And then what happened was when i put the soil up to the top of the CMU wall where the brick ledge is ( bricks have not been layed at this point) It rained a lot and poured over into the cells of the CMU and came in to the house. It was just bad BAD timing for the most part ... BUT !!!! this doesn't mean my french drain is at fault... adn they are fixing to put the bricks up this week and JUST NOW this week the architect is telling me we need to do this drainsheet or waterproofing membrane and need to dig out that by the wall ... The architect is going to call me today from what the contractor and i just talked about .. the contractor is saying its not my fault either. That the architect should have suggested this to begin with. and then there is the rain that poured into the cells. The contractor actually was there at the time it was raining and looked out and saw it going in there and started to do something about it. But it was a little to late and then the water oozed in ...

might lay the bricks and never have anymore trouble out of it ...
i told the contractor to fill the cells with motar b4 the bricks went in.
to make sure.
Reply With Quote
  #14  
Old 01-02-2008, 05:25 PM
chris638 chris638 is offline
LawnSite Member
 
Join Date: Feb 2007
Location: Hamilton, OH
Posts: 149
[QUOTE=SiteSolutions;2082486]1.

So I was supposed to backfill with 15' of gravel on that basement I did last summer? And the owner is just supposed to have gravel instead of grass all against his house? The guy said he used the perf pipe with a sock on it, so it's not going to clog.

There is a layer of seperation in between the gravel and the soil. Either filter fabric or straw. If you have ever seen a house being backfilled they are required by building code to seperate the soil and the gravel. Most of the time they use straw, because by the time the straw decomposes, the dirt has completely settled. Plus straw is cheaper than filter fabric. In Ohio, they must have this inspected before the house is backfilled with soil.

2.

You're right. Architects have to get a lot more schooling and experience than engineers.

Where did you get this information? This doesn't even make sense.
Reply With Quote
  #15  
Old 01-02-2008, 05:28 PM
chris638 chris638 is offline
LawnSite Member
 
Join Date: Feb 2007
Location: Hamilton, OH
Posts: 149
I'm still not sure where the architect comes into play. Why is he recommending the ways to backfill the house?
Reply With Quote
  #16  
Old 01-02-2008, 05:43 PM
LindblomRJ's Avatar
LindblomRJ LindblomRJ is offline
LawnSite Silver Member
 
Join Date: Apr 2006
Location: Rapid City, South Dakota
Posts: 2,577
An architect handles design and other features of the structure.

The engineer makes sure the structure is sound and will withstand the enviroment it is to rest in.
__________________
Ryan
Spring Creek Lawn & Landscape

Veritas and æquitas
Reply With Quote
  #17  
Old 01-02-2008, 08:06 PM
AGLA AGLA is offline
LawnSite Bronze Member
 
Join Date: Mar 2002
Location: Cape Cod
Posts: 1,684
Write a change order to dig up and place the new materials with an hourly rate plus materials. Have it signed by the person paying you and then do the work.

What do you usually do when there is a change? Eat it? or bill for it?
Reply With Quote
  #18  
Old 01-02-2008, 09:15 PM
turfquip's Avatar
turfquip turfquip is offline
LawnSite Senior Member
 
Join Date: Dec 1999
Location: Florence, Kentucky
Posts: 860
Quote:
Originally Posted by clyde View Post

6" perforated drain pipe.
sand around pipe and then washed gravel on top, backfill with
soil.
Why sand? That is not common practice around here. Sand would slow down migrating water getting into the pipe??
Reply With Quote
  #19  
Old 01-02-2008, 09:25 PM
SiteSolutions's Avatar
SiteSolutions SiteSolutions is offline
LawnSite Bronze Member
 
Join Date: Apr 2007
Location: Huntsville, AL
Posts: 1,098
Quote:
Originally Posted by chris638 View Post
Where did you get this information? This doesn't even make sense.
Have you ever looked into architecture or engineering programs at a major university? Engineering students are graduated in 4 years, maybe 5 if they take their time. You can't call yourself an architect for eight years plus. An architect has to study engineering and art, has to know codes, has to make it all work. Not that it is easy to be a PE, but I come from a place populated mostly by engineers. You can't spit without hitting an engineer in this town. Hell, my previous employer called me an "engineer" even though I don't have the degree. Engineers are great and all, but an architect should know his stuff.
Reply With Quote
  #20  
Old 01-02-2008, 09:33 PM
SiteSolutions's Avatar
SiteSolutions SiteSolutions is offline
LawnSite Bronze Member
 
Join Date: Apr 2007
Location: Huntsville, AL
Posts: 1,098
Quote:
Originally Posted by chris638 View Post
There is a layer of seperation in between the gravel and the soil. Either filter fabric or straw. If you have ever seen a house being backfilled they are required by building code to seperate the soil and the gravel. Most of the time they use straw, because by the time the straw decomposes, the dirt has completely settled. Plus straw is cheaper than filter fabric. In Ohio, they must have this inspected before the house is backfilled with soil.
Must have misunderstood what you said originally. To me, it read as though you were impying that no earth could be placed atop the gravel. My apologies.

Soil down here must be different from Ohio; we don't have to use fabric or straw between the crushed stone and fill material. In fact, if fabric is used on the drain itself, gravel isn't always used. Probably another reason is there's a lot fewer houses with real basements down here. All the "drained" houses I've worked on have been poured slab walls, with the basement being cut into the side of a hill.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 08:33 PM.

Page generated in 0.09887 seconds with 7 queries