Register free!
Search
 
     

Click for Weather
Reply
 
Thread Tools Display Modes
  #1  
Old 11-16-2001, 04:21 PM
KerryB KerryB is offline
LawnSite Senior Member
 
Join Date: Aug 2001
Location: North Carolina transition zone 7&8
Posts: 661
leyland cypress

Ok everyone, I have to bid on a job for a natural fence.
37 #3 leyland cypress cost $6.25ea
I figured 9cuft mulch around each one. If you dont think this is enough please tell me.
13.59 per yd we will call it 13yds to be safe.
so $176.67 cost.
I am not sure about labor. I would ordinarily charge 3x the cost of the plant. However, this ground is very hard and rocky. Any help would be appreciated.
I will be hand digging. yeah I know .lol
How would you bid on this one?
And any suggestions about this job would be appreciated.
Thanks
Reply With Quote
  #2  
Old 11-17-2001, 11:51 AM
KerryB KerryB is offline
LawnSite Senior Member
 
Join Date: Aug 2001
Location: North Carolina transition zone 7&8
Posts: 661
OK I reestimated my mulch to 14.5 cuyds.
Cost:
Mulch 212.52
cypress 3gallon $6.25ea 37
Black soil compost 2400lbs $64.20
drive time 3 trips to haul mulch and compost approx. 70milesx3 $150.00
1 trip to nursery 60milesx1 $50.00
labor 1.0 hrs per cypress includes prep time and difficulty factor. ground hard clay rocks
37 hrs x 35.00 1,295.00

mulch: $ 425.00
cypress trees: $ 694.00
compost: $ 129.00
drive time: $ 200.00
labor: $1,295.00

total: $2,743.00

Any help, suggestions, comments?Thoughts?
Reply With Quote
  #3  
Old 11-17-2001, 04:57 PM
diginahole diginahole is offline
LawnSite Member
 
Join Date: Feb 2001
Location: Port Perry, Ontario
Posts: 249
hand dig 37 @ 5 cu ft holes = 7 cu yards. I can dig 2 cu yards per hour so that is 3.5 hours. For really hard digging maybe as much as double, more than that its time to look at renting iron. Bring plants from truck to hole = 1 hour. Fill holes and water in maybe 2 hours. mulch 14 cu yard @ 5 cu yards per hour = 2.8 hours. delivery x 4, $50 for 70 miles doesn't feel right. don't forget time spent getting loaded. Do you need to load and remove excavated material? 4 cu yds onto a truck by hand 2 hours. 2 hours for set up, clean up and travel to site. Total 14 - 18 hours. + material + delivery. So IMO 37 hrs to plant seems to long, but 35 an hour seems a little thin. iwould have come in around 1700 which works out to 45.95 per plant.

Add $ 200 for warranty.

Last edited by diginahole; 11-17-2001 at 05:08 PM.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 08:45 AM.

Page generated in 0.06626 seconds with 7 queries