Staying on

Found out today I will be staying with our cut in half crew for the remainder of our time on the job I've been working on. I was told a couple weeks ago that I might be let go right about now, then I was told that I might stay on. Well, we're done with the bulk work finally, I think we have about 2 more days of trucking and all of our focus will be on the footings.

This week has been pretty crazy, we were on a dead run to get down to the floor so the drillers could get gone. I think I did 4 or 5 lifts around the building, it's about 1,000 feet per lift around the whole building. Crazy to think that myself and a guy in a 200 faced over a mile of wall. Had some real long days, grade checking for 12 hours is really hard on the body. Today I got lucky and was in a 400 for about 4 hours, then I jumped in the D6R for about an hour, finished up the day in one of our Komatsu WA-350's running material from a ramp cut down to a sloped bench so it could be loaded out in the trucks.

Here's a photo of the site taken 2 weeks ago. The wall straight across is 4 lifts deep. We went down to 2 more lifts from there, it's pretty damn deep now. You can see the drill rig parked, it's that blue excavator with a huge drill mounted on it, pretty sweet. They can drill 450 feet of wall in about an hour and a half, then the machine sits the rest of the day. This photo was taken on a Saturday, we weren't trucking material out. You can see the orange fabric rolled out right in front of the D8. Typically when exporting, trucks would come down the ramp and take a left, come around and shoot back up the ramp. In the heat of trucking, it was wide enough for 2 trucks wide and they'd be stacked in there pretty tight, we ran 50 trucks on a 1 hour cycle during the heat of things. Once we hit sand at the bottom, trucks can't run on it, so the sandy bottom where the fabric is laid was used to bridge over the sand, Then we placed 4-6" spalls over the fabric so the trucks don't get stuck. I believe when this photo was taken the trucks were bringing in the stone and that 400 is stockpiling it. When I first started this job, there were no walls shot in yet and only the road in the bottom was cut but it was much higher. We had 30 foot wide benches at the top of where the walls now sit and the D8 would carve down and push toward the 400's loading trucks. Slowly and surely, we made it down to the floor. As you can see, there's a cable railing all the way around the tops of the walls, the general contractor is very safety oriented. Angle iron bolted to the walls with some hardcore wire rope. Very safe site, everything is run very well by the GC.


This photo you can see the huge bucket we run on that 400. I was running that hoe today stockpiling sand, we only had 2 hoes loading till today, no sand. Got a call on the CB that one truck needed a load of sand. The dash 7 I was in has a fairly long stick compared to the dash 6 I was used to loading trucks with. Truck made me reach at least 10-12 feet, just couldn't get close enough to me with the pup. Had that 400 on her toes a little bit stetching out with 4 yards of sand.
__________________

Go hard, go fast, or go home

Last edited by Scag48; 09-28-2008 at 01:34 AM.
Reply With Quote
  #2  
Old 09-28-2008, 02:16 AM
Gravel Rat Gravel Rat is offline
LawnSite Member
 
Join Date: Jul 2002
Location: British Columbia
Posts: 9,544
That is one h*ll of a hole is that one store or is that a whole mall ?

You have proved yourself to the boss/foreman so its why they are keeping you on which is good.

I don't think you could dig a hole that deep in B.C. without hitting solid rock or in Vancouver and not hitting the water table.
Reply With Quote
  #3  
Old 09-28-2008, 02:27 AM
Scag48's Avatar
Scag48 Scag48 is offline
LawnSite Fanatic
 
Join Date: Jul 2000
Location: Marysville, WA
Posts: 6,061
It's for a technology company based here in the Seattle area everyone here is familiar with.

The top of the cut was very, very hard till. We had to rip it all with the 8 before it could be pushed to the 400's. I was in the 8 one day about 3 weeks ago and had to rip some of that hardpan on a 2:1 slope coming down from one of the walls. The dirt is so hard the 8 would start skipping on it going up the slope, it would wiggle back and forth. Tough to feather an 8 up that slope when she's sliding back and forth, especially with an old school 8 running steering clutches instead of diff steer. I'll take the 6R, so fast, so smooth, rides like a chariot, and is louder than hell.

The day I loaded trucks a couple weeks ago I got the hoe with our dubbed "donicker" bucket. No teeth on that 72" beast, just a cutting edge. I ran out of soft material after I got slammed with 6 or 7 trucks in a row and absolutely could not get through the hardpan with that bucket, it would just glaze it. Of course I was sitting on a bench where we coudn't get the 8, not like I had time to wait for it to be ripped. Just struggled along to get the bucket filled.

This job is getting to be nuts, tons more people on the site now compared to 2 weeks ago. Now the electricians are here running temporary power for the tower cranes and all that stuff. Big crane company showed up earlier this week with a Liebherr truck crane and dropped 2 gigantic modular buildings in place. No joke, each one of these buildings is at least 3,000 square feet, they're about 60 feet long and they're a double wide deal, 2 stories each, so a total of 8 sections for both buildings. The ironworkers showed up to set the rebar for the tower crane footing we dug out Thursday. I think they're going to pour the pad sometime next week and start throwing up the first tower crane. We'll be digging the other tower crane footing sometime next week, it will probably start being erected the following week. I hear things get even crazier once the carpenters show up and start building forms. Should be interesting to see what happens.

Overall I've been pleased with this job and I love the company I work for. I'm learning a lot, this is HUGE money stuff compared to what I'm used to. The stuff I'm learning is so diverse, one day I'll be running a GPS rover, next day I could be on the 8 or a 400. It's hard to replicate this kind of experience anywhere else, this is exactly why I went union.
__________________

Go hard, go fast, or go home

Last edited by Scag48; 09-28-2008 at 02:35 AM.
Reply With Quote
  #4  
Old 09-28-2008, 02:54 AM
Gravel Rat Gravel Rat is offline
LawnSite Member
 
Join Date: Jul 2002
Location: British Columbia
Posts: 9,544
I bet they are in a hurry to beat the weather get the foundation started.

Once the iron workers get flying they will have that building constructed quickly.
Reply With Quote
  #5  
Old 09-28-2008, 11:13 AM
bobcat_ron's Avatar
bobcat_ron bobcat_ron is offline
LawnSite Fanatic
 
Join Date: Nov 2007
Location: Abbotsford, British Columbia
Posts: 9,926
You Yankees and pin on couplers are like pigs and sh*t. That's an average bucket size here. I sure miss that 330CL and the seven foot "2 scoops and you're loaded" bucket.
__________________
“The only difference between a pigeon and a farmer today
is that a pigeon can still make a deposit on a John Deere.” - Harry De Jong



http://www.youtube.com/user/69rd96
Reply With Quote
  #6  
Old 09-28-2008, 11:40 AM
mrusk mrusk is offline
LawnSite Gold Member
 
Join Date: May 2003
Location: northern jersey
Posts: 3,244
Can you please describe what wall facing is?
Reply With Quote
  #7  
Old 09-28-2008, 01:52 PM
bobcat_ron's Avatar
bobcat_ron bobcat_ron is offline
LawnSite Fanatic
 
Join Date: Nov 2007
Location: Abbotsford, British Columbia
Posts: 9,926
Quote:
Originally Posted by mrusk View Post
Can you please describe what wall facing is?
Prepping the cut for shotcrete or tie backs.
__________________
“The only difference between a pigeon and a farmer today
is that a pigeon can still make a deposit on a John Deere.” - Harry De Jong



http://www.youtube.com/user/69rd96
Reply With Quote
  #8  
Old 09-28-2008, 02:33 PM
Scag48's Avatar
Scag48 Scag48 is offline
LawnSite Fanatic
 
Join Date: Jul 2000
Location: Marysville, WA
Posts: 6,061
Quote:
Originally Posted by mrusk View Post
Can you please describe what wall facing is?
Just like Ron said. Take a hoe and vertically cut a wall within 1" of tolerance either way from vertical. I was grade checking this process, running a laser to guide the hoe. We've faced with a 400, but I don't prefer it and the operator usually doesn't either. The 200 is much more suited to facing. With the 400, you're 40 feet away from the wall, tough to see. It's all about hand signals and I've become pretty good at that.

After we cut the walls, the drillers come in, throw in some soil nails, tie some mesh to the previous lift and shotcrete the wall. Then tie the nails into the finished face. Pretty cool process.

As for pin on buckets, I was never a huge fan of pin grabbers. But when you have a huge fleet of iron, it's nice to be able to share buckets with other hoes. The ability to turn them around backwards is nice as well. The big bucket I've found out is around 4 yards.
__________________

Go hard, go fast, or go home

Last edited by Scag48; 09-28-2008 at 02:38 PM.
Reply With Quote
  #9  
Old 09-28-2008, 04:25 PM
coopers's Avatar
coopers coopers is offline
LawnSite Bronze Member
 
Join Date: Nov 2002
Location: Western Washington
Posts: 1,179
What's wrong with pin grabbers? I agree with Scag, the ability to share is nice as well as turn the bucket around...Scag, that site is looking nice! They are really working away at the Safeway site near my house too...the neigborhood project slowed down a tad though.
Reply With Quote
  #10  
Old 09-28-2008, 05:29 PM
Scag48's Avatar
Scag48 Scag48 is offline
LawnSite Fanatic
 
Join Date: Jul 2000
Location: Marysville, WA
Posts: 6,061
We sent a few trucks to Safeway on Friday I believe. After the rain, Friday was a mess. Trucks kept getting hung up, so we shut the trucking down early. Another guy and myself scraped the haul road clean of mud after all the trucks were done, rolled it a bunch of trimes, and we were smooth sailing all day Saturday. Supposed to be good weather until Wednesday, we should be done trucking by then.

Demolition has started on another job we just got, hopefully within a month or two the dirt crew will go in. Not sure if that will be us, probably not, but if things dry up I can only hope I will be sent over there. We do another building next spring for the same company we're working for now, that very well could be my crew heading over there to dig that bad boy. It's supposed to be bigger and deeper than this hole.
__________________

Go hard, go fast, or go home
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 04:29 AM.

Page generated in 0.11815 seconds with 7 queries