pipeline construction PICTURES!!

building this big natural gas pipeline through central PA here...all these pictures were taken within a 2 mile stretch, it was really muddy today so i was a little bummers it was too wet for me to drive the pipeline and possibly find more equipment, but this is one crews worth of equipment here....enjoy

we'll start with the two backfill machines






__________________
Project Engineer
Part Time Farmer
Reply With Quote
  #2  
Old 09-28-2008, 03:30 PM
Dirt Digger2's Avatar
Dirt Digger2 Dirt Digger2 is offline
LawnSite Silver Member
 
Join Date: May 2006
Location: PA
Posts: 2,396
more of the two backfilling machines i found





now i believe this machine is probably a backfill helper and also the access road maintenance dozer





h
__________________
Project Engineer
Part Time Farmer
Reply With Quote
  #3  
Old 09-28-2008, 03:35 PM
Dirt Digger2's Avatar
Dirt Digger2 Dirt Digger2 is offline
LawnSite Silver Member
 
Join Date: May 2006
Location: PA
Posts: 2,396
here are more of the machines i found....overall there were (3) 330's, (2) 345's, (1) D8, (1)D7, and an 853 pipelayer....i would have loved to see the piplayers on this job..the pipe was 36" pipe and in the wet areas it was concrete coated so i am sure they had some big layers...maybe if i swing out there next week they might have them onsite









this guy came a long way...i am guessing it is the welding crews pipelayer


__________________
Project Engineer
Part Time Farmer
Reply With Quote
  #4  
Old 09-28-2008, 03:38 PM
Dirt Digger2's Avatar
Dirt Digger2 Dirt Digger2 is offline
LawnSite Silver Member
 
Join Date: May 2006
Location: PA
Posts: 2,396
here are a few of the project/driving






__________________
Project Engineer
Part Time Farmer
Reply With Quote
  #5  
Old 09-28-2008, 03:40 PM
Scag48's Avatar
Scag48 Scag48 is offline
LawnSite Fanatic
 
Join Date: Jul 2000
Location: Marysville, WA
Posts: 6,061
I would LOVE to be on a pipeline crew. Always white knuckling through the woods on steep slopes. I am finally officially pipeline certified, got my card in the mail 2 weeks ago. About time, took the test and all that good stuff about 4 months ago during training. Sometime during my lifetime I'd like to travel with a pipeline crew.
__________________

Go hard, go fast, or go home
Reply With Quote
  #6  
Old 09-28-2008, 03:40 PM
Dirt Digger2's Avatar
Dirt Digger2 Dirt Digger2 is offline
LawnSite Silver Member
 
Join Date: May 2006
Location: PA
Posts: 2,396
heres just a crumby video of 4-wheeling through the "access roads" that the state forest opened up for the pipe crews


__________________
Project Engineer
Part Time Farmer
Reply With Quote
  #7  
Old 09-28-2008, 03:49 PM
bobcat_ron's Avatar
bobcat_ron bobcat_ron is offline
LawnSite Fanatic
 
Join Date: Nov 2007
Location: Abbotsford, British Columbia
Posts: 9,912
What's the chunk of plating for on the blade of the D7? I'm thinking a laser mount, or an anchor point at best?

That "mesh" bucket on the 330DL is for digging in trenches that are full of water (to keep them from collapsing), the mud stays in the bucket and the water passes out, I've seen that used before, it also makes a good ditch cleaning bucket.
__________________
“The only difference between a pigeon and a farmer today
is that a pigeon can still make a deposit on a John Deere.” - Harry De Jong



http://www.youtube.com/user/69rd96
Reply With Quote
  #8  
Old 09-28-2008, 03:55 PM
Dirt Digger2's Avatar
Dirt Digger2 Dirt Digger2 is offline
LawnSite Silver Member
 
Join Date: May 2006
Location: PA
Posts: 2,396
Quote:
Originally Posted by bobcat_ron View Post
What's the chunk of plating for on the blade of the D7? I'm thinking a laser mount, or an anchor point at best?

That "mesh" bucket on the 330DL is for digging in trenches that are full of water (to keep them from collapsing), the mud stays in the bucket and the water passes out, I've seen that used before, it also makes a good ditch cleaning bucket.
the plate i don't know....anchor point probably, both dozers had one

the mesh bucket is for backfilling...i went out there friday when they were working (when i discovered the job) and the 330 was up on the hill and he would pick up a bucket then shake it to put fine dirt around the pipe...once the pipe was covered he would scoop whatever he could and cover the rest, as you can tell the pipeline here is going through a mountain so it is rock and more rock...they don't want to larger rocks next to the pipe....i wouldnt want to be the operator on the machine, it looked like he was really getting jared around by shaking fines out of his bucket
__________________
Project Engineer
Part Time Farmer
Reply With Quote
  #9  
Old 09-28-2008, 04:01 PM
Gravel Rat Gravel Rat is offline
LawnSite Member
 
Join Date: Jul 2002
Location: British Columbia
Posts: 9,544
What a muddy site to work on and that looks like the kind of mud once it dries in the undercarriage its there for life

I guess when your at work you wear hip waders regular gum boots are not tall enough
Reply With Quote
  #10  
Old 09-28-2008, 04:20 PM
Dirt Digger2's Avatar
Dirt Digger2 Dirt Digger2 is offline
LawnSite Silver Member
 
Join Date: May 2006
Location: PA
Posts: 2,396
this particular area was in a valley between peaks where a stream flows....the site on friday was bone dry, thats why i was hoping i would be able to drive it in my truck, but it rained the last 2 days here so when i got out there i didn't want to risk getting stuck with nobody around to pull me out (i didn't even have cell phone service)...so i just got out and walked on top of the pipe line out of the mud

the crew must have worked in the rain saturday because i don't know why else their machines would be so muddy...regardless they will have their fun tomorrow when they get out there and can't drive their trucks to get to the machines
__________________
Project Engineer
Part Time Farmer
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 04:00 AM.

Page generated in 0.11718 seconds with 7 queries