Register free!


Reply
 
Thread Tools   Display Modes
  #21  
Old 02-15-2002, 06:25 PM
kris kris is offline
LawnSite Bronze Member
 
Join Date: Apr 2001
Location: nowhere
Posts: 1,833
Thank-you ... I like the sounds of the curbing and will check to see if this is acceptable.

Can I please pick your brain a bit more ...... a client is asking that we put fabric behind the wall...... his thinking being that it will stop washout through any small gaps ...
My position is NO .... my reasoning is that the fabric could cause the infill area to become saturated and will increase the hydrostatic pressure ...possibly causing the wall to fail.... any wisdom on this?

thanks in advance
Reply With Quote
  #22  
Old 02-15-2002, 07:05 PM
paul paul is offline
Lawnsite Addict
 
Join Date: Dec 1999
Location: Chicago,Ill.
Posts: 1,625
Stick with your gut

No fabric should be used unless your dealing with heavy clay soils, but thats a whole other story!
Reply With Quote
  #23  
Old 02-15-2002, 07:31 PM
steveair steveair is offline
LawnSite Bronze Member
 
Join Date: Feb 2000
Location: morristown, nj
Posts: 1,073
Hello,

this reminds me of a few jobs where we built walls to make grade for a septic leach field.

The walls were 4 ft and the engineer had plastic behind the walls........I wonder what kind of complications that brings.

From my own experiences, a substantial amount of 3/4 clean behind the wall solves the problem of soil washing out through the wall. The only problem arise at the top. For the first year, water runoff at the top of the wall washes some surface dirt into and out of the top few layers of block down the rest of the wall. However, after about a year, this stops as the soil/stone eventually 'plugs' up those top gaps and eliminates the problems.

steve
Reply With Quote
  #24  
Old 02-15-2002, 08:19 PM
Stonehenge's Avatar
Stonehenge Stonehenge is offline
LawnSite Bronze Member
 
Join Date: Feb 2000
Location: Midwest
Posts: 1,277
According to the engineers at Versa-Lok:

If you are building tiered walls, and the distance between the walls is 2X or more than the height of the LOWER wall, you can treat them as independant walls.

They also recently had a change of heart about fabric behind walls - they used to reccommend always doing it, now their thoughts are in line with yours, Kris: silt gets caught in the fabric, clogging it up, making the chance for higher hydro forces greater.

Versa-Lok Brute is one mean mutha...

But this is all according to Versa-Lok.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 06:53 AM.

Page generated in 0.07969 seconds with 7 queries