Register free!
Search
 
     

Click for Weather
Reply
 
Thread Tools Display Modes
  #1  
Old 02-16-2009, 04:34 PM
Ramairfreak98ss Ramairfreak98ss is offline
LawnSite Silver Member
 
Join Date: Aug 2005
Location: Burlington County, NJ
Posts: 2,212
Ever do a $900 25' x 3' paver walkway?

Local ad i saw has an advertisement from a company claiming they'll come out and do a 25x3' paver walkway for $900 lol. Since we've done ones similar to that size last year, and net at least $2k with only a couple modifications attaching to the driveway or removal of an existing crushed stone walkway as "prep", i cant ever see doing one of these even in the best of scenarios for less than 1k.

Just a pallet of block for something of this size is $350-425. Even if your crew could go in in one single 8hr day, prep, lay and walk away by 5pm

assume $400 for block
$30-50 edging?
$100~ crushed stone/aggregate
$15 spikes or nails for edging
- excavation prep, most times we always have to load and haul offsite big or small
Say 2-3 guys @12hr for 8hr day
$288 roughly for 3 guys, plus taxes
-vehicle/machine wear and tear
-hauling skid of block to site from your supplier


your cost before profit is $853, wtf, for $900? HOW?
__________________
Ford Trucks, Simplicity machines, John Deeres, Ferris mowers, Stihl/Echo/Redmax handheld equip. lots of trailers
Reply With Quote
  #2  
Old 02-16-2009, 05:54 PM
zedosix's Avatar
zedosix zedosix is offline
LawnSite Silver Member
 
Join Date: Feb 2003
Location: Eastern Ontario
Posts: 2,394
Easy enough

Cheapest brick is $1.25 or so sq.ft.
No restraint, no nails
No geo-textile
No polymeric sand
All crushed stone with stone dust as screenings. 6" max. excavation
Runner pattern= minimal cutting
Cheap labour $10/hr

Chance of picking up more work while on site = good possibility.

I think its possible but highly unlikely that everyone is going to want or have the setting for a 25'x3' walkway unless all your homes are built the same.
Reply With Quote
  #3  
Old 02-16-2009, 06:51 PM
mrusk mrusk is offline
LawnSite Gold Member
 
Join Date: May 2003
Location: northern jersey
Posts: 3,244
Zeo right. I'd alost bet its a stone dust base.
Reply With Quote
  #4  
Old 02-16-2009, 07:44 PM
LB1234 LB1234 is offline
LawnSite Gold Member
 
Join Date: Dec 2004
Location: Central Jersey
Posts: 3,211
hey, I got guys by me quoting between 9-10 per square. The show up to the site, scribble down what they claim they are going to use and state a square foot price. When I get there they wonder why I'm not producing a price immediately. I have to then explain why I don't have a square foot price.

We did a 6x8 paver landing for a deck last summer (somewhere around that size) and if memory serves me correctly it came out to be around 1800 bucks. We only excavated, brought new topsoil in, reset the grade, and seeded.

LOL
Reply With Quote
  #5  
Old 02-16-2009, 07:47 PM
Midstate Lawncare's Avatar
Midstate Lawncare Midstate Lawncare is offline
LawnSite Senior Member
 
Join Date: Dec 2007
Location: Central Illinois
Posts: 268
Maybe it is a way to get into new neighborhoods or it is an ad that when you call they say ok, and when they show up they say they just sold out of that stone but we can use this stone for $XXXX. That is rediculous and mrusk is dead on with the prices. And around here the "good" landscaping employees get paid $10.00 per hour.
Reply With Quote
  #6  
Old 02-16-2009, 07:54 PM
PlatinumLandCon's Avatar
PlatinumLandCon PlatinumLandCon is offline
LawnSite Bronze Member
 
Join Date: May 2007
Location: Toronto, Ontario
Posts: 1,315
I've done something similar, let me try to remember all the details.

First off, it was for a guy about 15 houses down, leaving spoils on-site on a Saturday. It was 40x3.5', L-shape, with 32' being one side and 8' being the other. Approx costs:

Excavation 8"- by hand, myself with my really hard working "foreman", 3 hours x $50/hr= $150
Gravel- 3yd (only bought 2yd, had 1 left over), $60
Geotex- 175sf @ 0.10/sf= $17.50
Sand- 1yd= $40
Pavers- $2/sf x 150sf= $300
Edge- 8 pieces (had 2 left over) = $65
Spikes- 100-120 (no idea actual #)= $60
Polysand- 1 bag= $25
Soil+Sod= $50

TOTAL= 767.50 plus about 4 more hours to install= $50

Charged him $1500 (cash).

Not bad for a Saturday. I was done at 4pm and relaxed with a burger and some TV.
__________________
2004 Chevy 3500 Dually 4x4 CC/LB D-Max/Allison
Western 8'6" MVP+ w/ wings
Western Pro-Flo 2 Salter
Reply With Quote
  #7  
Old 02-16-2009, 07:54 PM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is offline
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,708
yeah, but you dont need a full pallet, even after the 10% waste factor. So the left overs get rolled into the next job, those left overs get rolled ino the job after that, and so on.


Also, one example, this past summer and fall Belgard had a surplus of 2 yr old pavers that they sold for around $1/ SF. It's said that in Dec one contractor bought ALL the remaining pallets. When I heard that I instantly thought "not a bad idea, with the bad economy you can really sell a lot of small jobs at that price".


Or could be that the guy is out of his mind and he'll be out of business in no time.

On the other hand, about 4 years ago I attended a VanderKooi seminar, his associate Tony Bass doing the speaking. This is what Mr. Bass said, and it's words I live by: "Never under estimate your competition"




.
__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.

Last edited by DVS Hardscaper; 02-16-2009 at 08:01 PM.
Reply With Quote
  #8  
Old 02-16-2009, 08:06 PM
LB1234 LB1234 is offline
LawnSite Gold Member
 
Join Date: Dec 2004
Location: Central Jersey
Posts: 3,211
If they are the same guys that do this type of work....about 2" of base, and perhaps an inch or so of dust just dump and spread. Make sure to precompact the base so you can walk all over it as you lay the pavers. You only excavate about a half inch outside the border coarse...one inch tops. Why go farther than what the walk needs to be. Why waste time pulling back the bedding...just trowel some concrete right into place. This was done summer of '07. This past summer it was settling all over the place and heaving. There are tripping hazards all over the darn thing. We watched them do this work over a two week timeframe.
Reply With Quote
  #9  
Old 02-16-2009, 08:13 PM
LB1234 LB1234 is offline
LawnSite Gold Member
 
Join Date: Dec 2004
Location: Central Jersey
Posts: 3,211
would help if I attached the pictures for a reference. Sorry
Attached Images
   
Reply With Quote
  #10  
Old 02-16-2009, 08:18 PM
LB1234 LB1234 is offline
LawnSite Gold Member
 
Join Date: Dec 2004
Location: Central Jersey
Posts: 3,211
one more...
Attached Images
 
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 06:20 AM.

Page generated in 0.11143 seconds with 8 queries