I've got a question to toss around in here. What do you all use for a time figure for placing bark mulch? I'm not looking for dollars, we all have our own hourly rate. I just want to compare what we use for a time factor when bidding to place a cu/yd of mulch. No removal of old, no edging, nothing but moving a yard of material from the truck, or a pile in the driveway to its resting place under/around shrubs, plants, trees, etc. I find that I'm coming in at right around .8 man hours to move/place it on an average site where you can plan on wheeling it around the house in a big wheelbarrow. How does that shape up with the rest of you?
Reply With Quote
  #2  
Old 04-19-2000, 11:48 AM
Lanelle Lanelle is offline
LawnSite Bronze Member
 
Join Date: Feb 2000
Location: No.VA, zone 7
Posts: 1,361
That sounds about right for residential work. Just to make the figuring easier, we round up to one man-hour per cu. yard and then add extra if the accessibility is poor.<br>We use double-shredded hardwood mulch which may take a little longer to spread, as well.<p>----------<br>Lanelle<br>
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 11:28 PM.

Page generated in 0.05949 seconds with 7 queries