Ball and Burlap Question

Hi, I posted before about a related job. But I have another question. I will have a 44" bobcat tree spade on a T300 for a day. With a crew of 4 guys total, including the guy in the skidsteer. How many evergreen trees do you think I could ball and burlap, tie, and load on a flatbed semi in an 8-hour day. I plan on balling about 1/2 of the trees with a 36" ball. Mostly Pine, Spruce, and Firs

Thanks in advance for helping a rookie out!
Reply With Quote
  #2  
Old 04-05-2009, 09:53 PM
FLCthes4:11-12 FLCthes4:11-12 is offline
LawnSite Senior Member
 
Join Date: Mar 2009
Location: N.E. Georgia
Posts: 284
As always depends. Here in Georgia I can did around 8-10 per hour if you row dig them but you will have the same time or more handling and loading them. How many trees are you looking to dig. Also there are guys around here that will dig for 10 per tree plus materials (basket, burlap, strap)
Reply With Quote
  #3  
Old 04-07-2009, 05:39 AM
tenndigger tenndigger is offline
LawnSite Member
 
Join Date: Apr 2009
Location: Tullahoma, TN
Posts: 53
I think that will spend a lot of time tying the tops of the evergreens first. A full 44" ball weighs 1500-1700 lbs and you should get 30-35 per trailer load. A 36" ball weighs 7-800 lbs and 45-50 per load. With a good operator digging 12-15 balls per hour would seem about right. The time to load depends how close you can set your trailer to the field. With the plants close about an hour to load and then 1/2 hour to tarp.
Reply With Quote
  #4  
Old 07-20-2010, 01:37 AM
treefarmer treefarmer is offline
LawnSite Member
 
Join Date: Jul 2010
Location: Western MA
Posts: 8
It sounds like you haven't done much of this work before, so it will be very slow the first day. Also, you can spend a LOT of time loading trees if the trailer is not close to the trees (and I mean within 150' of your work area). And if your soil is rocky, add time as well.
But assuming your soil is clean, and you tie the trees up the day before, I'm gonna guess you could get 40 trees dug, balled, crimped, and loaded/tarped in an 8 hour day.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 10:21 PM.

Page generated in 0.08540 seconds with 9 queries