View Poll Results: Please let me know what you would do
There is nothing wrong 12 85.71%
use a different concrete guy next time 2 14.29%
make them tear it out and repour 0 0%
Voters: 14. You may not vote on this poll

Reply
 
Thread Tools   Display Modes
  #11  
Old 12-06-2011, 10:01 AM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is online now
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,867
Like I said earlier, the curb did not just magically appear. The concrete guy told the yard cutting guy they would do a curb and the yard cutting guy likened the idea.

A concrete slab for vehicular use is 4 to 6 inches in depth.

The curb is another 4-inches.

So that tells us the finished product will be 8 to 10 inches above grade.

Like I always say, you need to be able to calculate grades. You need to be able to PLAN. You need knowledge in construction, grading, and drainage if you wanna be a Hardscaper god.


.
Posted via Mobile Device
Reply With Quote
  #12  
Old 12-06-2011, 10:26 AM
lawnMaster5000 lawnMaster5000 is offline
LawnSite Senior Member
 
Join Date: Jul 2000
Location: St. Louis Missouri
Posts: 589
Thank you for the replies.

The edge of the driveway is inches from the property line and that is why we did not want to have to build up along that side of the driveway. The neighbor has a perfect lawn very flat with just the perfect slope for drainage. They did not want us adding 8 inches of soil along the side.

The rolled curb was installed according to our design and as requested. The question was if the concrete guys should have finished that 8+ inches of exposed side of the driveway. Most replies have said no.

I guess this is just a reminder of a lesson learned long ago. Contracts need to spell out every detail of every project and nothing can be assumed.
__________________

Happy Mowing from StL
-Scott Marquart

www.westcountylandscaping.com
Reply With Quote
  #13  
Old 12-06-2011, 10:37 AM
lawnMaster5000 lawnMaster5000 is offline
LawnSite Senior Member
 
Join Date: Jul 2000
Location: St. Louis Missouri
Posts: 589
DVS,

You are correct in that a hardscaper needs to be able to calculate grades. We had all grades marked exactly. The concrete crew did not follow our grade stakes nor the architects plans provided to them (both showed the same thing). The rolled curb is supposed to be 10-12"" above grade, concrete crew made it about 8" above.

I am sorry if I havent been clear but all I was asking is
Why did they not provide a broom finish to that exposed 8" of concrete?

As replies on here have indicated I guess most people don't expect that level of professionalism and don't mind having the rough unfinished concrete wall. You don't leave the forms on steps until the concrete cures, you don't leave the forms on a raised patio. Both of those get a broom finish. Why leave the forms on here?
__________________

Happy Mowing from StL
-Scott Marquart

www.westcountylandscaping.com
Reply With Quote
  #14  
Old 12-06-2011, 11:40 AM
iowa iowa is offline
LawnSite Senior Member
 
Join Date: Dec 2003
Location: NW IA
Posts: 305
No concrete company that I have ever seen strips the forms off early to broom finish the sides that would normally be backfilled, unless specified. Looks like it's your loss in this situation.
Reply With Quote
  #15  
Old 12-06-2011, 12:42 PM
Kiril Kiril is offline
LawnSite Fanatic
 
Join Date: Jun 2007
Location: District 9 CA
Posts: 18,316
IMO, the "curb" looks like an after thought and the lack of brushing on the top surface to match the rest of the driveway is very unprofessional. That said, if you wanted a finished curb on all exposed edges, then you should have spec'd the curb be built using a curbing machine. Since you didn't, you got what you paid for.
Reply With Quote
  #16  
Old 12-06-2011, 12:56 PM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is online now
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,867
Quote:
Originally Posted by lawnMaster5000 View Post
DVS,

You are correct in that a hardscaper needs to be able to calculate grades. We had all grades marked exactly. The concrete crew did not follow our grade stakes nor the architects plans provided to them (both showed the same thing). The rolled curb is supposed to be 10-12"" above grade, concrete crew made it about 8" above.

I am sorry if I havent been clear but all I was asking is
Why did they not provide a broom finish to that exposed 8" of concrete?

As replies on here have indicated I guess most people don't expect that level of professionalism and don't mind having the rough unfinished concrete wall. You don't leave the forms on steps until the concrete cures, you don't leave the forms on a raised patio. Both of those get a broom finish. Why leave the forms on here?

All in all this boils down to:
i) communication
ii) experience and knowlodge (on your end)

I may sound harsh, but don't take it personally.

If you're playing contractor you need to make sure you have all your I's dotted and T's crossed. You need to know exactly what's going to take place. Sounds to me like they finished the concrete and you went there a day later and said "eww, that looks terrible", not realizing that's what you were getting.

When we've done jobs for project managers and such, I've had some of them drill me about every single move we're intending to make at the property. All they're doing is looking out for their client, making sure no stone is left unturned.

So many scenerios. It's not *COMMOM* practice for a concrete finisher to broom the side of a driveway edge, as that's typically backfilled. So if you want the side boomed, you should have listed that in the contract that you and the concrete guy both signed. We all want our work to look good, brooming the side is very easy, the concrete guy may have thought something else was going to take place.

As far as forms being removed, that's minor. If the concrete people are not aware that you wanted the edge finished, then leaving the forms on isn't killing anything.

My concrete finisher removes the forms usually about 24 hrs later. BUT.....he uses his own forms and he reuses them on other jobs. In other words he's grabbin his stuff and movin on to the next job.

Sometimes he'll have us supply the forms. In which case he does not return to pull them out, he leaves it to us.




.
__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.
Reply With Quote
  #17  
Old 12-06-2011, 05:12 PM
neighborguy neighborguy is offline
LawnSite Member
 
Join Date: May 2000
Location: Southeastern Wisconsin
Posts: 172
"The concrete crew did not follow our grade stakes nor the architects plans provided to them (both showed the same thing). The rolled curb is supposed to be 10-12"" above grade, concrete crew made it about 8" above."

SO what you are saying is that your plan would have had the concrete another 2-4" higher? and you want to complain that the concrete guys left you with an exposed edge that you can't grade up to? Let me start by saying that I hate everything about concrete but I also realize it is a necessary evil. Th concrete guys probably saw your height realized how ridiculous it was and brought it down t a more manageable height. As for them not broom finishing it I believe it was a lack of communication. You probably didn't tell them to fish that side. Most concrete guys I have worked with don't give two poops about the existing grade because it isn't their problem. They assume you will fill it in.
Reply With Quote
  #18  
Old 12-06-2011, 05:51 PM
Patriot Services's Avatar
Patriot Services Patriot Services is online now
LawnSite Fanatic
 
Join Date: Jul 2006
Location: Tampa FL
Posts: 8,685
How does the customer feel about the end result? Are they expecting you to improve anything further?
Posted via Mobile Device
Reply With Quote
  #19  
Old 12-06-2011, 07:05 PM
SVA_Concrete's Avatar
SVA_Concrete SVA_Concrete is offline
LawnSite Senior Member
 
Join Date: Oct 2010
Posts: 463
your problem can be fixed with a product called RubCrete http://www.prospec.com/products/prod...1&acc=4&id=110

run a quickie saw to remove the line from where they stacked the forms and then rub the honeycomb.

shouldda couldda woulddda --- use duct tape at the form joints, vibrate the curb a bit problem solved.

my personal opinion, i don't like the curb

regarding the hot tub pad... did you have an electrician install a bonding wire into the concrete?

if it is indeed 3/8" that is pretty poor workmanship.
__________________
.
.
If you do what you've always done, you'll get what you've always got.
Reply With Quote
  #20  
Old 12-06-2011, 08:07 PM
vtscaper vtscaper is offline
LawnSite Member
 
Join Date: Mar 2007
Location: Burlington VT
Posts: 159
that 8" is gonna catch someone off guard....looks real haggard let alone unsafe.

even if you really couldnt backfill which seems ridiculous then you could have put a small wall on the house side to drop the whole thing down..even just a 5" and you could of backfilled that without anyone noticing..

finished or not the end looks bad.. if its the neighbor complaining i would just sell them on them on backfilling it. otherwise tuff sh&%. no concrete guy would have done that without you specifically asking because normally it would NEVER be left like that.

as for the pad...it wasnt done right. try to get them back for that...however you would be better off floating it out yourself in an hr and being done with it since the finish isnt going to be that important w hot tub on it..
__________________
Chris di Stefano
www.distefanolandscaping.com
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 08:51 PM.

Page generated in 0.11705 seconds with 9 queries