Register free!


Reply
 
Thread Tools   Display Modes
  #1  
Old 12-12-2011, 09:44 PM
superintendent superintendent is offline
LawnSite Senior Member
 
Join Date: Dec 2008
Location: Western Kentucky
Posts: 394
how much would you have done this for

I maintain a 14 acre soccer complex. I had a soil test done and the pH was low and the potassium level was low so I order what was need and did the job. The material cost me right at $1000 so now what would you have charge for the job.
Reply With Quote
  #2  
Old 12-12-2011, 10:04 PM
DA Quality Lawn & YS's Avatar
DA Quality Lawn & YS DA Quality Lawn & YS is offline
LawnSite Fanatic
 
Join Date: Sep 2007
Location: Rochester, MN
Posts: 8,037
How long will it take you to apply to the complex?
__________________
7x14 Stealth SE Enclosed with 48" side ramp
08 Toro Z400 48" deck, 21HP Kaw with EZ Vac twin bag
09 Exmark Turf Tracer HP 36"
21" Toro SR4 Super Recycler
Stihl KM90 Kombi w/ straight shaft trimmer & tiller heads
Husqvarna 125B Blower
PG Magnum
Turfco XT5 Aerator
Turfco LS-22 Overseeder
EcoLawn 200 Applicator

I can do all things through Him who gives me strength.
Philippians 4:13
Reply With Quote
  #3  
Old 12-12-2011, 10:40 PM
jad004's Avatar
jad004 jad004 is offline
LawnSite Member
 
Join Date: Feb 2011
Location: N.E. Arkansas
Posts: 237
Of course, terrain and layout would matter but I would charge around $2300-2600. Several factors would come into play whether the low price or higher price but that would be a good range for me. I actually just quoted some soccer fields and this is the range that I used for almost the same area.
Reply With Quote
  #4  
Old 12-12-2011, 10:49 PM
superintendent superintendent is offline
LawnSite Senior Member
 
Join Date: Dec 2008
Location: Western Kentucky
Posts: 394
I charged $1925 it took me 2 hrs to do it.
Reply With Quote
  #5  
Old 12-12-2011, 11:01 PM
jad004's Avatar
jad004 jad004 is offline
LawnSite Member
 
Join Date: Feb 2011
Location: N.E. Arkansas
Posts: 237
What were you using to apply. I believe my Z would have taken just a little bit longer. Unless I spread at 8mph, which with calibration, could be done on the open fields. Thanks Super, I know what I'm calibrating this week.
Reply With Quote
  #6  
Old 12-12-2011, 11:50 PM
superintendent superintendent is offline
LawnSite Senior Member
 
Join Date: Dec 2008
Location: Western Kentucky
Posts: 394
With a intermidate. I was at 5 mph at 7 to 8 knot on hole opening. The 14 acre soccer complex is all open field. I had a total of just under 1 1/2 pallet. So putting between 5-6 bags per fill. The v-cal I could put 5 bags per fill and the potassium 6 bags per fill
Reply With Quote
  #7  
Old 12-12-2011, 11:57 PM
RigglePLC's Avatar
RigglePLC RigglePLC is offline
LawnSite Fanatic
 
Join Date: Jul 2006
Location: Grand Rapids MI
Posts: 9,510
So you covered around 6 acres an hour? I think the price was cheap. I am thinking you used a tractor with a Vicon spreader. And that you had to supply fuel, and transport the tractor to the site with a truck and a trailer. You used about $50,000 in equipment. Divide by 2000 working hours in a year--you have to charge 25 dollars per hour for the equip, plus gas, repairs and insurance.--say $50 and equip is tied up for 4 hours that's $400. You delivered the product, right? If you are skilled labor--that is one dollar per minute--add taxes and benefits, make it 2 dollars, for 4 hours $480.
Now add your usual charge per hour for overhead, electric, insurance, taxes, office help, so forth.
Now add a contingency for non-payment and a redo of the job in case of uneven green, or fert burn.
Reply With Quote
  #8  
Old 12-13-2011, 11:20 AM
Efficiency's Avatar
Efficiency Efficiency is offline
LawnSite Bronze Member
 
Join Date: Apr 2011
Location: zone 6
Posts: 1,098
whats your target hourly rate without figuring any materials? We would have been around $450 plus materials.
__________________
If this post seems mean, it's probably because I'm drunk posting. Maybe my next one will be better...
Reply With Quote
  #9  
Old 12-13-2011, 02:52 PM
ArTurf ArTurf is offline
LawnSite Silver Member
 
Join Date: Jan 2007
Location: Ark
Posts: 2,193
Quote:
Originally Posted by superintendent View Post
With a intermidate. I was at 5 mph at 7 to 8 knot on hole opening. The 14 acre soccer complex is all open field. I had a total of just under 1 1/2 pallet. So putting between 5-6 bags per fill. The v-cal I could put 5 bags per fill and the potassium 6 bags per fill
I take it you were using verde-cal? What did you use for the potassium? There are products that would combine the 2 and you could have got 2 birds with one application. Just a thought.
Reply With Quote
  #10  
Old 12-13-2011, 09:16 PM
superintendent superintendent is offline
LawnSite Senior Member
 
Join Date: Dec 2008
Location: Western Kentucky
Posts: 394
0.0.20 and yes I could have but dam have you price it that way. You saying that you charge $450 an hr or to do the job
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.