|
#41
|
||||
|
||||
|
Yes. Cleaned weekly. The one in the pic was kept as clean as you see it for the 3 weeks we used it. Top notch mom and pop business.
No problems. Most people would rather see a potty then have their kids watch the workers go wee wee in the bushes. Posted via Mobile Device |
|
#42
|
||||
|
||||
|
Quote:
Our base took close to 3 days but we did have to wheel it (Yikes!!!!). Our patio wasn't to be perfectly flat becaue of a sewer drain (water needed to flow in a dual slope manner) so it probably took the better part of a day just to set the screed rails with the laser.....FWIW Good Luck with the project Steve
__________________
The best way to predict your future is to create it. Ground Effects LLC |
|
#43
|
||||
|
||||
|
500 SF of holland stone in a day is a pretty good amount of work. Those 4x8 suck up time because they're small.
I am convinced that many contractors (or so called contractors) like to under estimate the scope of work. They see a nice job that they know they have a real strong shot at getting. So they play it down, because in their mind they want the job. They want the money, and they want to be able to say "we did a patio that used 21 pallets of pavers". There is no such thing as simply "click and drop". Like Xtreem said - there is measuring. There is stopping and making sure the joint lines are ALL straight. And there is STRAIGHTENING the joint lines because the probably are NOT straight! Our biggest paver install was a 6000 sf driveway. We have done a 3200 SF pool deck. And we have multiple pool decks ranging from 1600 SF to 2200 SF. The reason I'm stating this is because I'm trying to get the point across that I know my $h!t ![]() Pool decks are even trickier. The pools are either rectanuglar or rounded (duh!) But......you have to maintain STRAIGHT and SQUARE joints on ALL SIDES of the pool! If the pool is NOT square - you will have MUCH trouble making straight and square joint lines. And if the pool IS square - you'll still have trouble making straight and square joint lines. We have one pool deck that I assure you - the lines are perfect. Flawless. It probably took about 2 hours of measuring and measuring and double checking, staring at the ground, and coming up with a plan. And we have other pool decks where we have had to use creativity to conceal the break in the flow of lines. The pools were rounded, making it nearly impossible to get the pavers to meet up perfect. But if you were to go to these jobs, even the best paver installers would have to really study the pavers to find where we made it work. Hot summer temps are production killers. You're in blazing sun, on sand, with heat radiating off the sand and the pavers that are being put in place. Everyone is grumpy and doesnt want to be there. Making a lot of stops to drink water and to rest. Pricing summer jobs need to reflect the summer temps. If you think you're gonna *CLICK & DROP* and roll with it - you're kidding yourself. Wishful thinking. ,
__________________
"It's You vs. You" "People Throw Rocks At Things That Shine" My Equipment Brag List: -1 CAT hat -16 pairs of Hanes socks (the Heavy Duty model), many with holes. -12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please) -hundreds of t-shirts. Some w/ grease stains, some torn & tattered. -7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em. -1 belt -1 pair of old worn out Nike shoes. |
|
#44
|
||||
|
||||
|
Quote:
Steve
__________________
The best way to predict your future is to create it. Ground Effects LLC |
|
#45
|
||||
|
||||
|
Quote:
Do these straight and square joint lines still take as long if your doing a random pattern? How many man hours is a 2000 sf pool paver patio?
__________________
2012 Dodge 5500 Dump Kubota KX-161-3 Ex Takeuchi TL120 CTL Toro Z-Master's 07 Silverado SRW dump Hiniker 8.5 Poly V Cam Superline Tag Billy Goat Force 18 |
|
#46
|
||||
|
||||
|
It can sometimes be harder with a random pattern since you need to break the line
Posted via Mobile Device |
|
#47
|
||||
|
||||
|
i second that,
anyone can lay an "I" pattern. random takes a good eye, much more thinking involved.
__________________
. . If you do what you've always done, you'll get what you've always got. |
|
#48
|
||||
|
||||
|
Also depends on type of pavers we just finshed a 1200 sqf. Patio with the new pavers from cambridge ledgstone xl, me and 3 guys laid down 900 sqf. In 6 hours one of the best times we have done and it wasn't rushing it at all.
A pool patio of 2000 sqf. With easy access, 6" base, geotextile, fullnose coping square pool would take my company 450 man hours to complete. |
|
#49
|
||||
|
||||
|
Those xls are wild right? Did you use a brick carrier type thing or by hand? Once theyre set dont try and move em lol
Posted via Mobile Device |
|
#50
|
||||
|
||||
|
Quote:
__________________
2012 Dodge 5500 Dump Kubota KX-161-3 Ex Takeuchi TL120 CTL Toro Z-Master's 07 Silverado SRW dump Hiniker 8.5 Poly V Cam Superline Tag Billy Goat Force 18 |
![]() |
| Bookmarks |
«
Previous Thread
|
Next Thread
»
| Thread Tools | |
| Display Modes | |
|
|

















Linear Mode
