I am working on a project for someone and i was looking for a little help with how long something will take. I am a novice when it comes to operating a bobcat and don't know how long this will take.

I need to excavate an area that is 100 ft by 160 ft. I need to remove 2 feet of soil in this area. The excavated soil will be used to make a berm pretty close to the area where the hole will be. I need to know how long it will take to dig this hole? Any help will be greatly appreciated.

Thanks
Reply With Quote
  #2  
Old 06-29-2012, 07:10 PM
Bigred350 Bigred350 is offline
LawnSite Senior Member
 
Join Date: Jul 2006
Location: Florence,AL
Posts: 701
sounds like you need a dozer.
Reply With Quote
  #3  
Old 06-30-2012, 12:44 AM
muddywater muddywater is offline
LawnSite Bronze Member
 
Join Date: Sep 2011
Posts: 1,813
Quote:
Originally Posted by Bigred350 View Post
sounds like you need a dozer.
Or a takeuchi
Reply With Quote
  #4  
Old 07-01-2012, 02:22 PM
GreenI.A.'s Avatar
GreenI.A. GreenI.A. is offline
LawnSite Silver Member
 
Join Date: Jul 2010
Location: North East
Posts: 2,121
A lot of varialbes on this, what size bobcat? What kind of bucket/blade? What kind of soil? Have you done any test digs down to the 2" depth needed? is it all loamy top soil? sand? clay? is there 1' of rock at the bottom? is it solid stone under the top soil?
__________________
Why do people not respect us as they do other tradesmen? Because every Tom, Dick, and Harry doesn't think he can be a plumber or electrician!
Reply With Quote
  #5  
Old 07-02-2012, 09:07 PM
all ferris's Avatar
all ferris all ferris is offline
LawnSite Bronze Member
 
Join Date: Apr 2004
Location: belleville IL
Posts: 1,262
100' x 160' is a pretty big area to dig 2' out of with a bobcat. you need a track hoe.
Reply With Quote
  #6  
Old 07-02-2012, 10:40 PM
alldayrj's Avatar
alldayrj alldayrj is online now
LawnSite Gold Member
 
Join Date: Apr 2012
Location: Long island, NY
Posts: 3,192
its 1500 yards with swell factor. call an excavation company, and sub it out. a novice in a bobcat (regardless of size) will never get this done. you would have to go full tilt for a month of 12 hr work days
__________________
RJ All Day
Masonry and Landscapes
www.rjfalcone.com
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 11:22 PM.

Page generated in 0.07897 seconds with 9 queries