|
#1
|
||||
|
||||
|
Few recent jobs
Few random jobs from 2012, these are typical of the smaller type jobs that we had this season.
|
|
#2
|
||||
|
||||
|
few more
Forth picture down was done in 2002 and the last picture shows the same patio but with an extension we did this summer.
|
|
#3
|
|||
|
|||
|
nice work zedo
|
|
#4
|
||||
|
||||
|
As always stellar work, like the use of the natural stone mixed with paver work I been trying to incorporate that in some of our designs this year also. Nice job!
Posted via Mobile Device |
|
#5
|
||||
|
||||
|
Very nice, really clean. Excellent use of the boulders. Integrating natural stone really elevates the others materials.
Posted via Mobile Device |
|
#6
|
|||
|
|||
|
Flawless. Clean.
Love it, excellent work. |
|
#7
|
||||
|
||||
|
Beautiful stuff. In the second pic, dd you build the main step for lack of better words than build the steps on to it on either side, or are the steps tied in? Also what are your thoughts of steps/srw against vinyl siding?
|
|
#8
|
||||
|
||||
|
The steps are tied in together on this one. For this job in particular we excavated to the footing, close to 9' deep. We installed 23 tons of 2" clear stone, geo textile @ the 8' mark then added 3/4" granular to just under bottom block. Up against the house we installed platton (sp) right up to the top of the brick. I suppose we could cut the siding and install J-trim, but its a chance you take if there is ever any settling.
|
|
#9
|
||||
|
||||
|
nice stuff man, very clean. can you post some pics of the trucks and machines too? I like to see how people put their businesses together
__________________
RJ All Day Gehl 5640 Mustang 940 2003 International 4300 dump 1989 International S1900 dump 2003 Ford F250 6.0 diesel www.rjfalcone.com |
|
#10
|
||||
|
||||
|
Well maybe my work is clean, but equipment is getting tired looking.
|
![]() |
| Bookmarks |
«
Previous Thread
|
Next Thread
»
| Thread Tools | |
| Display Modes | |
|
|
















Linear Mode
