Tying a concrete pad into a foundation

I have read some conflicting opinions on whether this is a good practice or not. In an area where heaving is probable, is it a wise decision to drill rebar in to the house foundation? This was the practice of my previous employer, but some of what I have read is that this could cause the foundation to crack from the heaving of the pad. Some suggestions say that the pad should be completely seperate with expansion joint between the foundation.

Assume also, that the grade has a good slope off, the clear base is very well compacted, the concrete is 6" thick and is very well enforced.

I am starting on my own this year and do not want to be building pads for flagstone installation incorrectly

Opinions? Experiences?
Reply With Quote
  #2  
Old 03-12-2013, 10:53 PM
alldayrj's Avatar
alldayrj alldayrj is online now
LawnSite Gold Member
 
Join Date: Apr 2012
Location: Long island, NY
Posts: 3,183
Ive never doweled into a foundation unless it was an extension. I wouldn't do it.
Posted via Mobile Device
Reply With Quote
  #3  
Old 03-12-2013, 10:59 PM
shovelracer shovelracer is offline
LawnSite Silver Member
 
Join Date: Sep 2004
Location: North Jersey
Posts: 2,009
I've seen pads pinned to a foundation in the past and never seen it crack. I've never done it, but I could understand the concern as I see pads lift 2-3" in the winter from time to time. I vote expansion joint.
Reply With Quote
  #4  
Old 03-12-2013, 11:41 PM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is online now
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,905
Yes, i have seen slabs doweled into foundations all the time. And we have done this ourselves.

Think about a walk out basement. With a door. If there is a concrete slab outside that door - chances are......the slab is doweled into the foundation. This way it doesnt move and no one trips.


(dowelling into a swimming pool - different story. Dont do it.)

.
__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.
Reply With Quote
  #5  
Old 03-12-2013, 11:52 PM
dstifel's Avatar
dstifel dstifel is offline
LawnSite Senior Member
 
Join Date: Oct 2012
Location: des moines ia
Posts: 803
I have never done it and i learned from my dad who has 40 plus years in concrete. We always use and expansion joint and caulk it so that water can't get in and freeze pushing the pad away from the foundation. But to each its own i suppose.
Reply With Quote
  #6  
Old 03-13-2013, 08:24 AM
JMMack JMMack is offline
LawnSite Member
 
Join Date: Jan 2013
Location: PA
Posts: 16
the best (most expensive) way to do this is either pour the slab with a turn down frost wall or build a frost wall and pour on top of it. this is what I coordinate with our structural engineer on all commercial/school buildings for zero chance of slab heaving creating trip hazards or interfering w (and most importantly) the exterior door swinging open (as they do in all commercial/public buildings)

no doweling into foundation
Reply With Quote
  #7  
Old 03-13-2013, 08:48 AM
shovelracer shovelracer is offline
LawnSite Silver Member
 
Join Date: Sep 2004
Location: North Jersey
Posts: 2,009
Quote:
Originally Posted by JMMack View Post
the best (most expensive) way to do this is either pour the slab with a turn down frost wall or build a frost wall and pour on top of it. this is what I coordinate with our structural engineer on all commercial/school buildings for zero chance of slab heaving creating trip hazards or interfering w (and most importantly) the exterior door swinging open (as they do in all commercial/public buildings)

no doweling into foundation
This is what was done at my shop when they built it. I believe they went 18". The inspector expressed concern in the most severe winters, but apparently there was no violation so he didn't say any more, he was there for another reason. It has held up fine so far. On the the other hand we have a gov. account that had 6000sqft of walk tossed right up against the foundation with no expansion and not dowels. I has caused all sorts of problems with door opening, overdig settlement, and in one spot some expansion wall damage. So you need to do something.
Reply With Quote
  #8  
Old 03-13-2013, 09:42 AM
JMMack JMMack is offline
LawnSite Member
 
Join Date: Jan 2013
Location: PA
Posts: 16
check local frost depths

most of our projects frost walls/turn downs are 42" deep.
Reply With Quote
  #9  
Old 03-13-2013, 10:24 AM
shovelracer shovelracer is offline
LawnSite Silver Member
 
Join Date: Sep 2004
Location: North Jersey
Posts: 2,009
Frost is 42" here as well. In our case the structure was at 42", but the pad was independently floating. I agree that the pad could lift and block doors at 18", but it is on 2' of gravel and in 3 years has not moved any measurable amount. It would theoretically be possible for an exterior pad with perimeter frost wall to lift as one entire unit if bad subgrade or moisture conditions existed under the pad. Most common scenario for a turn down to frost depth would be a walkout basement. If a pad existed outside the walkout I would keep it completely separate regardless of installation method. The only way I personally would tie it in would be if the entire structure was down to frost depth like you would commonly see in a front door masonry staircase. I would not interlock the block though as is sometimes done, because by doing so creates a situation where exterior deterioration could result in water infiltration into the structure. In that case I would say appropriate to have a separate structure doweled to make one semi permanent unit.
Reply With Quote
  #10  
Old 03-13-2013, 11:56 PM
bigslick7878 bigslick7878 is offline
LawnSite Senior Member
 
Join Date: Jun 2008
Location: Towson,Maryland
Posts: 809
I have busted out tons of pads near foundations and can't remember one that was tied in to it. Always an expansion joint or just poured up against but never doweled in. (I will say most of these were poured long ago, very few new construction)

I mean if you what happens if you have to remove it near the foundation for some reason? That would be fun.

Unnecessary IMO. That pad isn't going anywhere.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 02:23 AM.

Page generated in 0.08454 seconds with 7 queries