Quote:
Originally Posted by cbass139 View Post
I have not educated myself thoroughly and aggregate and soils. I know basic stuff but I have always used cr8 which in my understanding is 3/4" crusher run which has 3/4" stone and smaller fines... Could this also be called 3/4"- due to the sieving process.. Where can I find information to educate myself on aggregates and proper uses.. I have always used cr8,#411,2b, as a base for walkways, patios, and walls. I am assuming this terminology all means the same. I pride myself on my craftsmanship but am always looking to educate myself and learn new things constantly. Being in business for a while know I should have learned this. I appreciate all feedback and criticism highly..

In regards to usinge either materials... Why have you chose to switch from one to the other are there any reasons? And what process do you use to use #57 as a wall base as far as compacting and leveling..
2a modified*
Reply With Quote
  #12  
Old 03-19-2013, 11:45 AM
OUTLANDER OUTLANDER is offline
LawnSite Senior Member
 
Join Date: Dec 2005
Location: Canton,Ohio
Posts: 576
Quote:
Originally Posted by cbass139 View Post
Never what?
never clean for your base. Only clean gravel for your drain field (backfill)......you dont want erosion qualities under your wall, or (base) what holds the wall. Clean has no compaction, and has voids....I've heard of some using fabric and all, but still its just not right. You dont want drainage under your wall, only behind it (controlled drainage)....#57 crusher is very good base
Reply With Quote
  #13  
Old 03-19-2013, 11:54 AM
cbass139 cbass139 is offline
LawnSite Member
 
Join Date: Oct 2007
Location: manchester new hampshire
Posts: 51
Quote:
Originally Posted by OUTLANDER View Post
never clean for your base. Only clean gravel for your drain field (backfill)......you dont want erosion qualities under your wall, or (base) what holds the wall. Clean has no compaction, and has voids....I've heard of some using fabric and all, but still its just not right. You dont want drainage under your wall, only behind it (controlled drainage)....#57 crusher is very good base
That's what I thought.. Do some research.. It's acceptable???? but why?? I'm totally on board with you in the thought process but I can't see how the other way is ok! I preached the same and decided to look it up and was really thrown off!!
Reply With Quote
  #14  
Old 03-19-2013, 12:05 PM
OUTLANDER OUTLANDER is offline
LawnSite Senior Member
 
Join Date: Dec 2005
Location: Canton,Ohio
Posts: 576
I know what you're saying....i just look at these opinions sometime like, why do what can work instead of what does work?..
Reply With Quote
  #15  
Old 03-19-2013, 12:20 PM
cbass139 cbass139 is offline
LawnSite Member
 
Join Date: Oct 2007
Location: manchester new hampshire
Posts: 51
I hear ya what are ncma specs
Posted via Mobile Device
Reply With Quote
  #16  
Old 03-19-2013, 04:12 PM
clipfert clipfert is offline
LawnSite Member
 
Join Date: Feb 2002
Location: Eastern PA
Posts: 186
NCMA specs are minimum 6" depth for base and 6" wider than your base course front and back or 12" wider than your block.
We always use a 24" wide base regardless to accomodate plate compactor.

If your asking what NCMA is...National Concrete Masonry Association
Its like ICPI but for SRW's
Reply With Quote
  #17  
Old 03-19-2013, 05:45 PM
cbass139 cbass139 is offline
LawnSite Member
 
Join Date: Oct 2007
Location: manchester new hampshire
Posts: 51
Quote:
Originally Posted by clipfert View Post
NCMA specs are minimum 6" depth for base and 6" wider than your base course front and back or 12" wider than your block.
We always use a 24" wide base regardless to accomodate plate compactor.

If your asking what NCMA is...National Concrete Masonry Association
Its like ICPI but for SRW's
I'm curious as to the ncma aggregate specifications for the base of a gravity srw.
Posted via Mobile Device
Reply With Quote
  #18  
Old 03-19-2013, 06:32 PM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is offline
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,739
Quote:
Originally Posted by OUTLANDER View Post
never clean for your base. Only clean gravel for your drain field (backfill)......you dont want erosion qualities under your wall, or (base) what holds the wall. Clean has no compaction, and has voids....I've heard of some using fabric and all, but still its just not right. You dont want drainage under your wall, only behind it (controlled drainage)....#57 crusher is very good base

Not sure where you obtained your knowledge, but what you wrote - AIN'T correct.

Number 1: Clean aggregate (#57) self compacts.

Number 2: It is PERFECTLY acceptable to use. Infact, if you look at most engineers specs you will see where they list for the base that you can use: a) Concrete. B) crusher run. C) #57. All 3 are acceptable.

Also - think of a french drain (dry well). A french drain consists of #57!!!! Because IT DRAINS!!!

So, if you think about it, you do not want water standing at the base of the wall. With that said - #57 clean is perfect because water can drain through it.

Ok, so there is probably someone reading this thinking "why would water collect at the base of the wall, what is this idiot DVS talking about?" Well - I have a buddy in Hinkley Ohio whom had a wall built by a decent size, busy, well known contractor. And that large, well known contractor turned out to be a contractor from He!!. And he built the wall with water collecting at the base. He used crusher run for the base and directed water to collect behind the wall! Had they at least used 3/4" clean - then maybe, just maybe, the water could drain.

Sometimes we use clean. Sometimes we use crusher run. Both are 110% acceptable. And we been building walls since 1997.



.
__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.

Last edited by DVS Hardscaper; 03-19-2013 at 06:39 PM.
Reply With Quote
  #19  
Old 03-19-2013, 08:00 PM
cbass139 cbass139 is offline
LawnSite Member
 
Join Date: Oct 2007
Location: manchester new hampshire
Posts: 51
Quote:
Originally Posted by DVS Hardscaper View Post



Not sure where you obtained your knowledge, but what you wrote - AIN'T correct.

Number 1: Clean aggregate (#57) self compacts.

Number 2: It is PERFECTLY acceptable to use. Infact, if you look at most engineers specs you will see where they list for the base that you can use: a) Concrete. B) crusher run. C) #57. All 3 are acceptable.

Also - think of a french drain (dry well). A french drain consists of #57!!!! Because IT DRAINS!!!

So, if you think about it, you do not want water standing at the base of the wall. With that said - #57 clean is perfect because water can drain through it.

Ok, so there is probably someone reading this thinking "why would water collect at the base of the wall, what is this idiot DVS talking about?" Well - I have a buddy in Hinkley Ohio whom had a wall built by a decent size, busy, well known contractor. And that large, well known contractor turned out to be a contractor from He!!. And he built the wall with water collecting at the base. He used crusher run for the base and directed water to collect behind the wall! Had they at least used 3/4" clean - then maybe, just maybe, the water could drain.

Sometimes we use clean. Sometimes we use crusher run. Both are 110% acceptable. And we been building walls since 1997.



.
I value your opinion I have read a lot of your posts... What do you use to determine which stone to use... I can not understand the concept and in order to sustain a good reputation I should. I understand using a crusher run base and drainage to redirect collecting water but would you pitch your subgrade to drain away and then install #57 creating a large French drain under the wall? Is using #57 stone preferred for smaller walls where drainage is not a huge necessity for added protection. Is #57 stone base used in conjunction with drainage behind wall... So many questions! I feel like a noob agian! Someone help me with this concept! I know a lot of others viewing are in the same boat as me.. I'm not afraid to say Im clueless to this concept of #57 as an srw base. Their has to be some methodology behind it.. Heads ... Tails... #57...cr8.... Just doesn't cut it for me haha
Posted via Mobile Device
Reply With Quote
  #20  
Old 03-19-2013, 08:08 PM
scagrider22 scagrider22 is offline
LawnSite Bronze Member
 
Join Date: Nov 2009
Location: somewhere
Posts: 1,162
DVS, do you know the name of the company that built your buddies wall, it didn't happen to be Exterior land development? I live in the next town south of Hinkley.

As for #57 I agree with DVS. Most city engineers require us to use #57 for our base on walls and they do compaction testing after every lift on a city job. We always get above 97%
Posted via Mobile Device
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 05:29 PM.

Page generated in 0.08152 seconds with 7 queries