How many hours total on the grinding?
What size screen did you run?
Did the grinder work as well as you thought, stumps in a horizontal isn't it's strong suit I would say
Posted via Mobile Device
Reply With Quote
  #232  
Old 03-29-2014, 09:17 PM
AEL's Avatar
AEL AEL is online now
LawnSite Bronze Member
 
Join Date: Oct 2009
Posts: 1,510
Total on this job is mabee 22 hours total grind time . Grinder works excellent , and as long as the stumps are broken up it will take them as fast as your can feed it. Stumps where broken up with the 329 . This was the first job with the grinder and so far we have learned a lot . There are some attachments that we will be purchasing in the next few weeks to make us more efficient then we already are. General is very happy and we have already priced a few more jobs for them. We have also been bidding a lot more of this type of stuff and am very optimistic about what's ahead.
Posted via Mobile Device
Reply With Quote
  #233  
Old 03-29-2014, 09:19 PM
AEL's Avatar
AEL AEL is online now
LawnSite Bronze Member
 
Join Date: Oct 2009
Posts: 1,510
We are running 6" top screen and 8" bottom screen
Posted via Mobile Device
Reply With Quote
  #234  
Old 03-29-2014, 09:45 PM
Kepple Services Kepple Services is online now
LawnSite Senior Member
 
Join Date: Mar 2006
Location: Orlando, FL
Posts: 361
Yeah, horizontal grinders are a bit picky with some stumps.. that's where a tub comes out a little on top. But when it comes to whole trees nothing will beat a horizontal. I just did a little 10 acre job and ground out the material in 2 days with ours. Had the whole job done from start to finish in 8 days. Did it by myself with just an excavator. Didn't need to root rake as there was TONS of trash on the ground including asphalt and concrete, and the property was illegally filled in with the same materials and more, so the contractor is screening about 20,000 yards of fill total and took care of the crap left over. It was a lightly wooded 10 acres but came out good. Have to go look at a 100 acre job and a 15 acre job for them tomorrow and bid it.
__________________
Reply With Quote
  #235  
Old 03-29-2014, 09:59 PM
sepm sepm is offline
LawnSite Member
 
Join Date: Apr 2012
Location: Toronto
Posts: 34
Very nice work! looks fun! How much longer do you have on that job?

Last edited by sepm; 03-29-2014 at 10:06 PM.
Reply With Quote
  #236  
Old 03-29-2014, 10:07 PM
hvy 1ton's Avatar
hvy 1ton hvy 1ton is offline
LawnSite Senior Member
 
Join Date: May 2009
Location: Lawrence KS
Posts: 556
329 was digging and sizing the stumps in situ and loading the sized stump on the artic then?
__________________
Life summed up by refrigerator magnets:
HE WHO DIES WITH THE MOST TOYS WINS
OLD RANCHERS NEVER DIE,
THEY JUST QUIT HORSIN AROUND
Reply With Quote
  #237  
Old 03-30-2014, 09:24 AM
AEL's Avatar
AEL AEL is online now
LawnSite Bronze Member
 
Join Date: Oct 2009
Posts: 1,510
Chris - you gotta post some pictures of these jobs sounds interesting
Posted via Mobile Device
Reply With Quote
  #238  
Old 03-30-2014, 09:26 AM
AEL's Avatar
AEL AEL is online now
LawnSite Bronze Member
 
Join Date: Oct 2009
Posts: 1,510
Quote:
Originally Posted by hvy 1ton View Post
329 was digging and sizing the stumps in situ and loading the sized stump on the artic then?
Yea the 329 was removing the stumps and breaking them up while putting them in windrows. Then they where loaded into the arctic and brought to a designated spot. I had one operator help for a few days and he didn't break them up as good as I wanted , so we went through the pile again to further break them up. It is way cheaper to go back and further process them then trying to do it as you are feeding the grinder , or trying to shove them into it.
Posted via Mobile Device
Reply With Quote
  #239  
Old 03-30-2014, 10:14 AM
ARP's Avatar
ARP ARP is offline
LawnSite Bronze Member
 
Join Date: Feb 2005
Location: Southeast, MA
Posts: 1,489
What kind of attachments are you looking at adding here Sean? Is a CBI stump screw one of those attachments?
__________________
A.R.Plante Industries, LLC
Land & Brush Clearing, Grading & Excavation, Colored Mulch Mfg, Contract Grinding, Cranberry Bog Services, Storm Cleanup, Snow Plowing & Ice Management

WWW.ARPLANTE.COM

A.R.Plante on Facebook: http://www.facebook.com/home.php#!/p...0670251?ref=ts

Check Out Our Videos on YouTube!: http://www.youtube.com/user/arplante...s?feature=mhee
Reply With Quote
  #240  
Old 03-30-2014, 10:50 AM
AEL's Avatar
AEL AEL is online now
LawnSite Bronze Member
 
Join Date: Oct 2009
Posts: 1,510
Cbi stump screw or some type of stump shear. The grinder can process material that is well broken up faster then you can feed it . No doubt it will take large stumps , but obviously it sacrifices production and I am changing teeth more often.
__________________
Sean

A.E.L

Excavating, Grading, Demolition, Land Clearing, Custom Grinding Services, Storm water management, Erosion Control.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 03:31 AM.

Page generated in 0.10202 seconds with 8 queries