longest retain wall in the world

or longest ive done

2 tiers 215 feet per tier 200' straight 15' 45degree angle at end

approx 3.5' average height

what are you guys charging per SFF? or LF? in the northeast

i dont own the footer, concrete guys will form/pour that. I gotta dig it tho.


will be using versa lok tumbled block (no worry of chipping it)

i got it for 39.80 a SFF. but last wall i did i got it at 67.5.

I hate retaining walls.
Reply With Quote
  #2  
Old 06-24-2013, 09:12 PM
alldayrj's Avatar
alldayrj alldayrj is offline
LawnSite Silver Member
 
Join Date: Apr 2012
Location: Long island, NY
Posts: 2,953
What do you charge per LF per caps? And what are you paying for block
__________________
RJ All Day
Masonry and Landscapes
www.rjfalcone.com
Reply With Quote
  #3  
Old 06-24-2013, 09:20 PM
italianstallion69 italianstallion69 is offline
LawnSite Member
 
Join Date: Sep 2012
Posts: 108
rj you do amazing work! saw your website. your work is 100%. makes me look bad.

but my clients arent paying for the taj mahal.

i got supplier quote on tumbled block @ 4' height for 24g, but ill step it to get it down to 3.5' average height.

i dont price caps seperately, as im not sure how much i pay per cap. trying to keep materials under 1/3 % so less than 22g with stone backfill etc.
Reply With Quote
  #4  
Old 06-24-2013, 09:35 PM
alldayrj's Avatar
alldayrj alldayrj is offline
LawnSite Silver Member
 
Join Date: Apr 2012
Location: Long island, NY
Posts: 2,953
Thanks man, I appreciate it. I know commercial work is about speed, i couldnt compete on a few that i priced, sticking to upper middle residential.

I always add caps in as a separate item since there more cap work on longer walls vs short tall walls plus the glue and time ain't cheap. Curves take forever etc.

Where's the job at?
that's a good ratio to keep.
__________________
RJ All Day
Masonry and Landscapes
www.rjfalcone.com
Reply With Quote
  #5  
Old 06-24-2013, 11:30 PM
italianstallion69 italianstallion69 is offline
LawnSite Member
 
Join Date: Sep 2012
Posts: 108
job is in western pa.

we only did one curve. it turned out OK but i would never get my guys a curvy job i doubt they can do it!

straight and 45-90 degree bends.thats all we do.


how are you moving pallets of block? with forks on a skid steer?

if you use a telehandler/lull/shootingboom forklift, it is much faster. u can raise the pallet til youre guys are basically sliding blocks onto the wall. I always say move the forklift dont carry blocks. I even put in my bids the quote is invalid if we cannot have a telehandler on site. $1200 a week from sunbelt. I get a genie 44? 6K 40' boom.

If i can learn how to run one, anyone can

now residential sites may not have enough space for a 22,000# forklift to swing around. but the time savings are immense. less tiring on your guys.

a bobcat just doesnt get close enough/extend/ cant get over curbs to get within 1" of the wall with confidence, in my opinion.
Reply With Quote
  #6  
Old 06-25-2013, 01:24 PM
alldayrj's Avatar
alldayrj alldayrj is offline
LawnSite Silver Member
 
Join Date: Apr 2012
Location: Long island, NY
Posts: 2,953
I do it all with the skid. I've been running it since I'm 9 so i do some stuff others wont. Definitely no telehandlers around here. Half the jobs are done with a wheelbarrow through a 4' gate
Posted via Mobile Device
Reply With Quote
  #7  
Old 06-25-2013, 05:52 PM
Impact-Vector Impact-Vector is offline
LawnSite Member
 
Join Date: Sep 2011
Location: Atlanta GA
Posts: 150
Weeks ago I would read these posts and get wonder about why you guys spend so much on equipment.

Today I picked up a different set of laborers, my usual didn't show, all I can say is they cost me more in rentals than I paid them and we didn't hit the target. Very dissapointing I was at the point of being willing to spend any amount to get rid of them
Reply With Quote
  #8  
Old 06-25-2013, 07:25 PM
alldayrj's Avatar
alldayrj alldayrj is offline
LawnSite Silver Member
 
Join Date: Apr 2012
Location: Long island, NY
Posts: 2,953
Laborers break down way more often than machines. And you own a machine and can work it day or night
__________________
RJ All Day
Masonry and Landscapes
www.rjfalcone.com
Reply With Quote
  #9  
Old 06-25-2013, 10:58 PM
italianstallion69 italianstallion69 is offline
LawnSite Member
 
Join Date: Sep 2012
Posts: 108
RJ

what are your thoughts on a backhoe to dig walls?

like a john deere 110 size 12-16000 lb?

i found a used 1000 hr cat 303 for 25g but an excavator is so much a one trick pony, dig trees or dig walls (and i dont do many walls)


Just dont know how manueverable a backhoe is for wall digging/tree planting versus a mini cuz I have never rented a backhoe.
Reply With Quote
  #10  
Old 06-26-2013, 07:14 AM
alldayrj's Avatar
alldayrj alldayrj is offline
LawnSite Silver Member
 
Join Date: Apr 2012
Location: Long island, NY
Posts: 2,953
Never ran one either but I'm sure on a big site like yours it would
Be good. You could put an auger on it for plantings too and use the loader to clean up
Posted via Mobile Device
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 05:52 PM.

Page generated in 0.07959 seconds with 7 queries