I hope he means 640 square feet
Posted via Mobile Device
Reply With Quote
  #12  
Old 06-27-2013, 07:24 PM
Dirtman2007's Avatar
Dirtman2007 Dirtman2007 is online now
LawnSite Platinum Member
 
Join Date: May 2008
Location: Raleigh, NC
Posts: 4,293
Quote:
Originally Posted by AWJ Services View Post
What kind of material you putting in for the leachfield?
600+ foot is a bunch of leachfield. Why so much?
yes I know the ground does not perc very well out there and that's what they required for a 4 bedroom out.

I will be using rock and gravel

400' of line for the innovated system.


my last question is when you are doing the 125' long line and the land slopes down how do you adjust for that.

EX: it says 30" in the ground and say over 125' the land falls 2'. so do I keep it level so that the end is only 8" under the ground or do I step the line down?
__________________
Chris

"Life is like running a motor grader. You have to look down the road and plan for whats ahead and not down at your feet!"


http://www.youtube.com/user/letsdig18


New facebook fan page
http://www.facebook.com/pages/Letsdi...3541611?v=wall

Reply With Quote
  #13  
Old 06-27-2013, 08:45 PM
AWJ Services AWJ Services is online now
LawnSite Platinum Member
 
Join Date: Jun 2004
Location: Ga
Posts: 4,208
That soil looked nasty for sure. You have too find the contour grades of the land. For example if you look at a map with topo lines then the lines will be what you will dig your trenches too. If you have multiple lines it does not matter if each line is at a different elevation. The dbox will take care of that. You have to find level grade for each trench and then dig it too depth. The trench ha stoo maintain 30 inch depth.
Reply With Quote
  #14  
Old 06-29-2013, 11:51 PM
bobcatoh bobcatoh is offline
LawnSite Member
 
Join Date: Dec 2006
Location: Hamilton Ohio
Posts: 24
You dig your lines along the contour, not down the hill.
If your not familiar with d boxes they have pre formed cut outs on all four sides.
At that depth you will also need to buy risers for them.
The 4" pvc sch 40 pipe coming out of your tank needs to run at a min. of 1% down hill to your first d box.
Cut out the bottom hole in the d box to the leach line.
Cut the hole in the d box from the tank, 4" above the top of your gravel in the leach field.
Cut the hole, going out to the next line so the bottom of the hole is level with the top of your gravel.
You want the line to fill with water then break over into the next line, the line from the tank wants to be 4" higher so it free falls into the d box. The boxes are tight with three pipe in them and you need to be able to put a cap on the line going to the fields on each line so that it can be capped off and rest if need be.
Then run down hill to the next line. We have min. c/c distances so the next run would be say 8' c/c.
Take your rod and paint out a level line across the contour for your distance. You should also take some 4" pvc with a clean out cap and place in the end of the trench vertically with some 1/2" holes drilled into the sides to be able to monitor the depth of water in the lines. This will let you know if that line needs to be capped off and let rest.
You can look through my pictures for examples here https://www.facebook.com/jeffmichael.../photos_albums
Reply With Quote
  #15  
Old 06-30-2013, 10:57 PM
Dirtman2007's Avatar
Dirtman2007 Dirtman2007 is online now
LawnSite Platinum Member
 
Join Date: May 2008
Location: Raleigh, NC
Posts: 4,293
so update on the septic system,

I got the tank set in the ground and I've decided to go with the 400' of easy lay pipe.

Im not a fan of it but I think its going to be the best and quickest for me knowing that it will all be in the back yard and only a riding mower will go over it.


plus its going to be cheaper since I was going to have 2k just in rock!
__________________
Chris

"Life is like running a motor grader. You have to look down the road and plan for whats ahead and not down at your feet!"


http://www.youtube.com/user/letsdig18


New facebook fan page
http://www.facebook.com/pages/Letsdi...3541611?v=wall

Reply With Quote
  #16  
Old 07-01-2013, 07:02 AM
AWJ Services AWJ Services is online now
LawnSite Platinum Member
 
Join Date: Jun 2004
Location: Ga
Posts: 4,208
Do you mean EZ Flow pipe? Which one you using? How much they charge you for it? It averages about 5.50 a foot here for the 1303 and 4.60 a ft for the 1203.

With you owning your own dump truck the gravel should be 10 a ton or less and you only need about 15 tons per 100 ft.
Reply With Quote
  #17  
Old 07-01-2013, 06:26 PM
Dirtman2007's Avatar
Dirtman2007 Dirtman2007 is online now
LawnSite Platinum Member
 
Join Date: May 2008
Location: Raleigh, NC
Posts: 4,293
Quote:
Originally Posted by AWJ Services View Post
Do you mean EZ Flow pipe? Which one you using? How much they charge you for it? It averages about 5.50 a foot here for the 1303 and 4.60 a ft for the 1203.

With you owning your own dump truck the gravel should be 10 a ton or less and you only need about 15 tons per 100 ft.
yeah the pipe in the center with the 2 foam tubes on the side.
Im not sure what it was I got 400ft of line, a 1k tank, D box all delivered for $2,600

10 a ton?!? I wish! the quarries here are 20 a ton for 57 stone
__________________
Chris

"Life is like running a motor grader. You have to look down the road and plan for whats ahead and not down at your feet!"


http://www.youtube.com/user/letsdig18


New facebook fan page
http://www.facebook.com/pages/Letsdi...3541611?v=wall

Reply With Quote
  #18  
Old 07-01-2013, 06:32 PM
Dirtman2007's Avatar
Dirtman2007 Dirtman2007 is online now
LawnSite Platinum Member
 
Join Date: May 2008
Location: Raleigh, NC
Posts: 4,293
here are some pics
Attached Images
     
__________________
Chris

"Life is like running a motor grader. You have to look down the road and plan for whats ahead and not down at your feet!"


http://www.youtube.com/user/letsdig18


New facebook fan page
http://www.facebook.com/pages/Letsdi...3541611?v=wall

Reply With Quote
  #19  
Old 07-01-2013, 06:41 PM
Dually00-00's Avatar
Dually00-00 Dually00-00 is offline
LawnSite Member
 
Join Date: Mar 2013
Location: Bucks county Pa
Posts: 180
Yikes 20 a ton is that delivered ? Our quarries are about 10 a ton if I go get it.
Reply With Quote
  #20  
Old 07-01-2013, 06:45 PM
Dirtman2007's Avatar
Dirtman2007 Dirtman2007 is online now
LawnSite Platinum Member
 
Join Date: May 2008
Location: Raleigh, NC
Posts: 4,293
Quote:
Originally Posted by Dually00-00 View Post
Yikes 20 a ton is that delivered ? Our quarries are about 10 a ton if I go get it.
nope that's the material cost. its ridiculous with 5 quarrys around they all are a monopoly. I could go 50 miles away and get it for 13 a ton but its not worth the time and fuel burnt to get it


closest quarry to the farm is 20 miles
__________________
Chris

"Life is like running a motor grader. You have to look down the road and plan for whats ahead and not down at your feet!"


http://www.youtube.com/user/letsdig18


New facebook fan page
http://www.facebook.com/pages/Letsdi...3541611?v=wall

Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 10:23 AM.

Page generated in 0.08470 seconds with 8 queries