Register free!
Search
 
     

Click for Weather
Reply
 
Thread Tools Display Modes
  #11  
Old 07-21-2013, 05:47 PM
alldayrj's Avatar
alldayrj alldayrj is online now
LawnSite Silver Member
 
Join Date: Apr 2012
Location: Long island, NY
Posts: 2,907
Quote:
Originally Posted by Agape View Post
In labor? For 2 guys, or 3+ guys?
Me and two laborers.
Reply With Quote
  #12  
Old 07-23-2013, 08:09 AM
White Gardens's Avatar
White Gardens White Gardens is offline
LawnSite Fanatic
 
Join Date: May 2008
Location: Bloomington IL
Posts: 6,765
Sidewalk in question.

__________________
White Gardens On Facebook.......WG Thread......Greencare For Troops......... mywhitegardens.com(under construction)

2005- Completion of University of Illinois Master Gardner's Program.
Reply With Quote
  #13  
Old 07-23-2013, 10:45 PM
Drakeslayer Drakeslayer is offline
LawnSite Member
 
Join Date: Apr 2013
Posts: 127
After seeing the pic it is definitely a $3000 job. I day for 3 guys and needed materials
Reply With Quote
  #14  
Old 07-24-2013, 12:19 AM
White Gardens's Avatar
White Gardens White Gardens is offline
LawnSite Fanatic
 
Join Date: May 2008
Location: Bloomington IL
Posts: 6,765
Quote:
Originally Posted by Drakeslayer View Post
After seeing the pic it is definitely a $3000 job. I day for 3 guys and needed materials
With or without the bricks. HO already had them, washed them, and moved them up and stacked them ready to set in place.
Reply With Quote
  #15  
Old 07-24-2013, 08:26 AM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is online now
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,745
That's a 2.5 day job. Fact.

One day for excavation and aggregate base installation, including clean up at the end of day, and hauling spoils.

Day 2 - paver install and cutting. If you work hard non-stop (no answering phone calls, no Facebook) you may have time to sand the joints and clean the chamfer real nice. If not, then you'll have to do the Joint sand when you come Back or turf restoration And clean up.

Day 3 - final grading, turf restoration, cleaning driveway which last yr we started pressure washing the driveways on the last day.
Reply With Quote
  #16  
Old 07-24-2013, 08:35 AM
Drakeslayer Drakeslayer is offline
LawnSite Member
 
Join Date: Apr 2013
Posts: 127
Quote:
Originally Posted by White Gardens View Post
With or without the bricks. HO already had them, washed them, and moved them up and stacked them ready to set in place.
Without Bricks
Reply With Quote
  #17  
Old 07-24-2013, 07:43 PM
big daddy b's Avatar
big daddy b big daddy b is offline
LawnSite Member
 
Join Date: Dec 2010
Location: East Syracuse, NY
Posts: 95
For me, three guys for two full days = $1,500.00 total. Labor only, materials extra.
Reply With Quote
  #18  
Old 07-24-2013, 08:43 PM
alldayrj's Avatar
alldayrj alldayrj is online now
LawnSite Silver Member
 
Join Date: Apr 2012
Location: Long island, NY
Posts: 2,907
30/man hour, glad I'm not in Syracuse unless you're paying them 8/hour cash
__________________
RJ All Day
Masonry and Landscapes
www.rjfalcone.com
Reply With Quote
  #19  
Old 07-24-2013, 09:35 PM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is online now
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,745
$750.00 for 3 guys for one day???

Lord, or how you put food on the table?
__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.
Reply With Quote
  #20  
Old 07-24-2013, 10:35 PM
Drakeslayer Drakeslayer is offline
LawnSite Member
 
Join Date: Apr 2013
Posts: 127
Quote:
Originally Posted by big daddy b View Post
For me, three guys for two full days = $1,500.00 total. Labor only, materials extra.
Must be nice to only work from 10-2.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 12:36 PM.

Page generated in 0.08629 seconds with 7 queries