Sod Question

Got a job putting down 24 pallets (12,000sq ft) of sod on a new construction site, no dirt prep that's already finished. My question is how long will this take can it be done in one day. I'll have a skid with forks to move the pallets where they need to be put down. I'll also have 4 guys working for me. Never done a sod job this big before so just trying to plan out how much time I need. Thanks
Reply With Quote
  #2  
Old 08-31-2013, 01:00 PM
KrayzKajun's Avatar
KrayzKajun KrayzKajun is online now
LawnSite Fanatic
 
Join Date: Oct 2006
Location: Harvey,LA
Posts: 10,329
So you already gave a price and landed the job without knowing how long it might take.
Reply With Quote
  #3  
Old 08-31-2013, 01:06 PM
jsslawncare's Avatar
jsslawncare jsslawncare is offline
LawnSite Bronze Member
 
Join Date: Feb 2011
Location: North Georgia
Posts: 1,658
Sod Question

If you know how long it takes to lay a pallet with the number of people you are using then multiple it by 24.
__________________
All equipment is wore out. <- Never mind. All equipment has been repainted and with new decals. It's like I have new mower's again!
48" Ferris WB
36" Ferris WB
All Echo hand helds
<- That's how I feel at the end of the day.
Reply With Quote
  #4  
Old 08-31-2013, 01:24 PM
Elite Outdoor's Avatar
Elite Outdoor Elite Outdoor is offline
LawnSite Member
 
Join Date: Aug 2008
Location: tulsa, oklahoma
Posts: 222
I'm looking for a real response, yes i have done the math, and figured up how long I 'think' it will take. I was looking for someone to give advice from there experience. Any help is appreciated
Reply With Quote
  #5  
Old 08-31-2013, 01:41 PM
agrostis agrostis is offline
LawnSite Bronze Member
 
Join Date: Nov 2009
Location: Winston-Salem NC
Posts: 1,694
One pallet of slab's take's one person one hour to lay, if it's roll's then 45 minute's.
Reply With Quote
  #6  
Old 08-31-2013, 02:03 PM
easy-lift guy's Avatar
easy-lift guy easy-lift guy is online now
Sponsor
 
Join Date: Aug 2011
Location: Venice, FL. USA
Posts: 2,058
Must be small pallets. Normally here in SW Florida pallets are 400 Sq Feet each. I est. 4 guys with the pallets already spotted, no beds or irrigation systems to work around 6 to 7 hours tops for all Four guys.
easy-lift guy
Reply With Quote
  #7  
Old 08-31-2013, 05:09 PM
Bigred350 Bigred350 is offline
LawnSite Senior Member
 
Join Date: Jul 2006
Location: Florence,AL
Posts: 694
I would say a day and a half.
Reply With Quote
  #8  
Old 08-31-2013, 06:11 PM
Snyder's Lawn Inc's Avatar
Snyder's Lawn Inc Snyder's Lawn Inc is offline
LawnSite Gold Member
 
Join Date: Feb 2011
Location: Kirksville Mo
Posts: 3,714
Quote:
Originally Posted by Elite Outdoor View Post
I'm looking for a real response, yes i have done the math, and figured up how long I 'think' it will take. I was looking for someone to give advice from there experience. Any help is appreciated
Why are you asking the question then if you already done the math.
Way to many factors in laying sod you have prep the borders to lay sod.
Works faster to have 2 laying and 2 packing
Time frame takes my crew lay the sod wont be same time has your crew

Small areas takes more time vs open areas where there is less cutting

Good luck on the job
__________________
Snyder's New Lawn Service Inc.
Since 1981
Reply With Quote
  #9  
Old 08-31-2013, 06:35 PM
Elite Outdoor's Avatar
Elite Outdoor Elite Outdoor is offline
LawnSite Member
 
Join Date: Aug 2008
Location: tulsa, oklahoma
Posts: 222
Quote:
Originally Posted by Snyder's Lawn Inc View Post
Why are you asking the question then if you already done the math.
Way to many factors in laying sod you have prep the borders to lay sod.
Works faster to have 2 laying and 2 packing
Time frame takes my crew lay the sod wont be same time has your crew

Small areas takes more time vs open areas where there is less cutting

Good luck on the job
What's the point of having this forum if u can't ask questions, if I already knew it all I wouldn't ask. Thanks for the answers everyone
Reply With Quote
  #10  
Old 08-31-2013, 06:59 PM
Snyder's Lawn Inc's Avatar
Snyder's Lawn Inc Snyder's Lawn Inc is offline
LawnSite Gold Member
 
Join Date: Feb 2011
Location: Kirksville Mo
Posts: 3,714
Quote:
Originally Posted by Elite Outdoor View Post
What's the point of having this forum if u can't ask questions, if I already knew it all I wouldn't ask. Thanks for the answers everyone
Most people ask question about things they don't know about or before they bid a job to double check there figures

You already have the job and you already did the math
What you going do if your math was wrong. Since Joe Blow said on Lawn Site should take 40 man hrs to do the job your math was 20 hrs
You going change you price before you start the job.

You must knew something if you already have the job
Or did you price it to cheap from comment in red

Are your pallets sell by sf or sq yards Here they sell it by the sq yard

Since you already have the job what is your price that you are laying it for
__________________
Snyder's New Lawn Service Inc.
Since 1981
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 08:29 AM.

Page generated in 0.07895 seconds with 7 queries