Old 02-03-2014, 03:06 PM
PremierSwrx PremierSwrx is offline
LawnSite Member
 
Join Date: Nov 2013
Location: Granbury TX
Posts: 119
Yes both of them are 2 speed machines, we have an additional 2 T300 on standby if we need them, it should balance out with the speed of digging and moving the mats back
__________________
Premier Site Work and Excavating LLC.
“Heavy Civil, Highway Construction and Land Development Solutions”
Reply With Quote
  #102  
Old 02-03-2014, 04:04 PM
lumberjack1986 lumberjack1986 is online now
LawnSite Member
 
Join Date: Jan 2014
Location: Columbus, MS
Posts: 108
The haul distance is ~200+ yards eh?

The hoppers only hold 2.5 yards struck. That's ~10 passes per load, 3 minutes tops. The cycle time to the dump will be longer than that, it would seem like you would want at least two hoppers per ex digging. Also another CTL at the dump site pushing the mud around.

Kinda like this.
Reply With Quote
  #103  
Old 02-03-2014, 08:56 PM
backhoe24 backhoe24 is offline
LawnSite Member
 
Join Date: Aug 2009
Posts: 35
Let's see some more of the D6 doing some heavy dozing.
Reply With Quote
  #104  
Old 02-03-2014, 09:07 PM
Krafty Krafty is online now
LawnSite Senior Member
 
Join Date: Jun 2009
Location: St. Louis MO
Posts: 633
Let me get this straight you bought a cat 330 and an adt to haul 5200 cubic yards of soil, and you are now going to try and do this with 2 mini ex, 2 skids, and possible and an extra 2 skids??
__________________
www.stldumpsters.com
Reply With Quote
  #105  
Old 02-03-2014, 10:11 PM
hoeman376's Avatar
hoeman376 hoeman376 is online now
LawnSite Senior Member
 
Join Date: Feb 2010
Location: Digging holes
Posts: 324
Quote:
Originally Posted by Krafty View Post
Let me get this straight you bought a cat 330 and an adt to haul 5200 cubic yards of soil, and you are now going to try and do this with 2 mini ex, 2 skids, and possible and an extra 2 skids??
I'm calling bs
Posted via Mobile Device
Reply With Quote
  #106  
Old 02-03-2014, 10:14 PM
lumberjack1986 lumberjack1986 is online now
LawnSite Member
 
Join Date: Jan 2014
Location: Columbus, MS
Posts: 108
There's the yardage, I looked back but didn't find it.

I wouldn't be scared of doing it with a mini 5-6 ton mini ex, much less two. They can swing 1/4-1/3 yard per 15 seconds easily. After seeing how deep the silt is, I might would want a dipper extension to keep the machine further from the edge of the "crust." With two minis, that's a long week's worth of digging.

Hauling is where the backup will be. Assuming the dumps don't have to run on a mat road (only the exs sitting on mats), I would plan on having ~100 yards/hour in hauling capacity, with a contingency for another 20-30%.

If the dump site is too wet for a dozer, you'll need at least one if not two CTLs pushing it out, depending on how wet it is and how far you have to push.


Sounds like a fun job, assuming the budget supports it, guessing around $6-8/yard with minis loading and CTLs pushing out. I would look into renting tracked dumpers for hauling.
Reply With Quote
  #107  
Old 02-03-2014, 10:23 PM
sepm sepm is online now
LawnSite Member
 
Join Date: Apr 2012
Location: Toronto
Posts: 34
Quote:
Originally Posted by Krafty View Post
Let me get this straight you bought a cat 330 and an adt to haul 5200 cubic yards of soil, and you are now going to try and do this with 2 mini ex, 2 skids, and possible and an extra 2 skids??
Im sure he didn't buy the 330 and adt for 1 job
Reply With Quote
  #108  
Old 02-03-2014, 11:45 PM
AEL's Avatar
AEL AEL is offline
LawnSite Bronze Member
 
Join Date: Oct 2009
Posts: 1,509
Should be interesting... Really looking forward to some pics of this. Do you have any pictures of your 3 336e you have? Or the 350 Deere and 750 Deere you bought?
__________________
Sean

A.E.L

Excavating, Grading, Demolition, Land Clearing, Custom Grinding Services, Storm water management, Erosion Control.
Reply With Quote
  #109  
Old 02-03-2014, 11:52 PM
AEL's Avatar
AEL AEL is offline
LawnSite Bronze Member
 
Join Date: Oct 2009
Posts: 1,509
Quote:
Originally Posted by lumberjack1986 View Post
There's the yardage, I looked back but didn't find it.

I wouldn't be scared of doing it with a mini 5-6 ton mini ex, much less two. They can swing 1/4-1/3 yard per 15 seconds easily. After seeing how deep the silt is, I might would want a dipper extension to keep the machine further from the edge of the "crust." With two minis, that's a long week's worth of digging.

Hauling is where the backup will be. Assuming the dumps don't have to run on a mat road (only the exs sitting on mats), I would plan on having ~100 yards/hour in hauling capacity, with a contingency for another 20-30%.

If the dump site is too wet for a dozer, you'll need at least one if not two CTLs pushing it out, depending on how wet it is and how far you have to push.


Sounds like a fun job, assuming the budget supports it, guessing around $6-8/yard with minis loading and CTLs pushing out. I would look into renting tracked dumpers for hauling.
I would be seriously seriously doubting 100 yards an hour with those machines in those conditions.
__________________
Sean

A.E.L

Excavating, Grading, Demolition, Land Clearing, Custom Grinding Services, Storm water management, Erosion Control.
Reply With Quote
  #110  
Old 02-04-2014, 12:11 AM
lumberjack1986 lumberjack1986 is online now
LawnSite Member
 
Join Date: Jan 2014
Location: Columbus, MS
Posts: 108
Quote:
Originally Posted by AEL View Post
I would be seriously seriously doubting 100 yards an hour with those machines in those conditions.
That's a bucket every 20 seconds per ex, for 50 minutes out of the hour. Actual cycle time should be closer to 15 seconds.
Posted via Mobile Device
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 07:17 PM.

Page generated in 0.07778 seconds with 8 queries