paving after stump removal

i want to remove a tree and grind stump..im going to have area paved,,how do you keep it from sinking so it can be paved..do you tamp it or wait so many years ?
Reply With Quote
  #2  
Old 02-02-2014, 08:51 PM
ducnut ducnut is offline
LawnSite Bronze Member
 
Join Date: May 2013
Location: central IL
Posts: 1,504
This is going to sound crazy. I had stumps ground out ~8yrs ago that are still settling. It takes forever for the roots and stuff to decompose. I had a lot of roots and one ground-out stump I paved over. The concrete in that area is a minimum 10" thick and some is as much 13". I've had a semi-tractor on it and it hasn't cracked, yet. I felt like it was cheap insurance to go thicker than necessary than to have it all break apart and need re-poured. My neighbor and I poured 45yds, by ourselves.
__________________
1st Class Lawn Service

'13 Hustler X-ONE, 60", Kohler ECV749 EFI
'05 Hustler FasTrak, 42", Honda GXV530
'13 Toro Timemaster 30"
'02 Lawn Boy SilverPro 21"
Stihl BR600 blower
Stihl BG55 blower
Stihl FS55R trimmer
Stihl KM55R Kombi system
Stihl MS180C chain saw
Stihl HS45 hedge trimmer
RedMax Reciprocator
Echo SRM225 trimmer
Echo GT-2000 trimmer
Gravely WB edger
Husqvarna 580BTS blower
Dolmar 245.4 string trimmer
'06 Chevrolet Silverado
'13 Bravo Star, 7'X12', V-nose
Reply With Quote
  #3  
Old 02-03-2014, 05:02 PM
lumberjack1986 lumberjack1986 is online now
LawnSite Member
 
Join Date: Jan 2014
Location: Columbus, MS
Posts: 224
Digging the stump out is easiest, but you can grind through the bottom of the stump and grind the roots out then dig the loose material out and backfill/compact. Leave the top soil out of the backfill, you'll likely need to import fill consistent with the rest of the pad.

Here's digging 3 stumps out. On this job the area was just becoming landscaped areas, so fill wasn't imported. If we were building over it, we build have backfilled with select fill and compacted it. Also the area around the stump would have been excised back to clean, virgin soil.


We've ground stumps out before that were under the footprint of a building, but now we just dig them out. It allows for a better finished product at a similar cost to grinding. On larger trees it's easier if we take the tree down. When the tree is short enough to fit in space provided, we hang a chain on top of the spar and start digging. Then we use the chain to pull on the trunk, popping the stump out with less digging. If we have the room we'll pull the whole tree over with minimal digging required.
Reply With Quote
  #4  
Old 02-03-2014, 05:16 PM
tommy g tommy g is offline
LawnSite Member
 
Join Date: Nov 2010
Location: highland md
Posts: 8
diggin it

wow...ok thank you very much for the info..
Reply With Quote
  #5  
Old 02-03-2014, 05:31 PM
lumberjack1986 lumberjack1986 is online now
LawnSite Member
 
Join Date: Jan 2014
Location: Columbus, MS
Posts: 224
Yep. Let me know if you need any more any info, it's pretty straight forward.
Reply With Quote
  #6  
Old 02-19-2014, 02:06 AM
vallz vallz is offline
LawnSite Member
 
Join Date: Jan 2014
Location: Kansas
Posts: 36
Just wondering, how long did it take in actual time to dig just one stump out? and total time for the entire project? Ive used a stump grinder before and it take a little while to get a significant portion out but if diggings just as quick, it seems the better way to go.
Reply With Quote
  #7  
Old 02-19-2014, 08:48 AM
lumberjack1986 lumberjack1986 is online now
LawnSite Member
 
Join Date: Jan 2014
Location: Columbus, MS
Posts: 224
It depends on the situation, but unless the stump is too big to get out of the hole relative to your excavator, dig them out. Otherwise grind through the bottom of the stump and then use the excavator to remove the root plate.
Posted via Mobile Device
Reply With Quote
  #8  
Old 02-20-2014, 10:52 PM
OneLineAtATime OneLineAtATime is offline
LawnSite Member
 
Join Date: Jan 2012
Location: Central Ohio
Posts: 195
Backfill hole with gravel.. Then pave it
__________________
Full time Mowing Crews

Bucket Truck/Chipper

Landscapes/Hardscapes

7 Trucks
2 Loaders
1 Mini skid steer
A Army of MEN

Reply With Quote
  #9  
Old 02-20-2014, 11:29 PM
lumberjack1986 lumberjack1986 is online now
LawnSite Member
 
Join Date: Jan 2014
Location: Columbus, MS
Posts: 224
Gravel around here is river rock, not what I would want to build on. Crushed limestone compacts and supports well, costs around $32/yard here. I can get red clay for $7/yard which is what I would use here, unless the customer or engineer specs something else.
Reply With Quote
  #10  
Old 02-23-2014, 09:49 AM
OneLineAtATime OneLineAtATime is offline
LawnSite Member
 
Join Date: Jan 2012
Location: Central Ohio
Posts: 195
Any kind of gravel is going to hold better than red clay... If you are going to listen to the specs then why did you start this thread?

Common since when installing a driveway, patio, walkway. Excavate dirt, set your base with gravel, then pave
__________________
Full time Mowing Crews

Bucket Truck/Chipper

Landscapes/Hardscapes

7 Trucks
2 Loaders
1 Mini skid steer
A Army of MEN

Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 04:02 PM.

Page generated in 0.07508 seconds with 9 queries