Register free!
Search
 
     

The Green Industry's Resource Center


Click for Weather
Reply
 
Thread Tools Display Modes
  #1  
Old 02-26-2014, 09:06 PM
mwalz's Avatar
mwalz mwalz is offline
LawnSite Senior Member
 
Join Date: Aug 2013
Location: St. Louis
Posts: 737
Bid on a shopping center. Need Help!

So this year will be the first year i will be going for commercial properties. I haven't really advertised and today i got a call from a guy wanting me to cut a shopping center. Way sooner than i thought i would get any big jobs. Now the issue i have is pricing it. And i only have a 36" mower.......And he said there was about 2 acres of grass. Well i drove by tonight, and my guess is it is closer to 2.5 acres. He said to give him a call back on a bid. But the problem i have is that i am unsure if my 36" can handle it. I would have a friend using the handhelds while i cut. If i can do it in no longer than 2 hours should i go for it? I really want this job but i don't want to under bid. He said that it would be cut every 10 days, 3 times a month. I'm thinking somewhere around the $100 mark for each cut? Too low? I have attached a Google map view of the property to give you an idea. Also all those little islands in the parking lot are mulched and don't have grass or any trimming to do.

Thanks for the help!!
Attached Images
 
__________________
My Equipment thread:
http://www.lawnsite.com/showthread.php?t=425995

18 Regualar Accounts
Reply With Quote
  #2  
Old 02-26-2014, 09:16 PM
nashlawn01's Avatar
nashlawn01 nashlawn01 is offline
LawnSite Senior Member
 
Join Date: Aug 2012
Location: Southwest VA
Posts: 425
If u could so it with 2 guys in 2 hrs at $100 you would make$25 per hr each before expenses. More like $225 per mow to me. Don't under bid it
Posted via Mobile Device
Reply With Quote
  #3  
Old 02-26-2014, 09:59 PM
Sprinkler Buddy's Avatar
Sprinkler Buddy Sprinkler Buddy is offline
LawnSite Senior Member
 
Join Date: Oct 2012
Location: Florida
Posts: 988
What about the parking lot? Picking up trash, etc... That's a lot of blowing, do they have a parking lot sweeper service?

If I only had a 36" mower with no plans to go bigger, I would pass. If you do decide to go bigger, will you have regrets if they decide to drop you next season? Their isn't much love when you get into commercial jobs. Not much in residential either but it's a lot less painful when you lose one and they are much easier to replace.
Reply With Quote
  #4  
Old 02-26-2014, 10:57 PM
mwalz's Avatar
mwalz mwalz is offline
LawnSite Senior Member
 
Join Date: Aug 2013
Location: St. Louis
Posts: 737
Quote:
Originally Posted by Sprinkler Buddy View Post
What about the parking lot? Picking up trash, etc... That's a lot of blowing, do they have a parking lot sweeper service?

If I only had a 36" mower with no plans to go bigger, I would pass. If you do decide to go bigger, will you have regrets if they decide to drop you next season? Their isn't much love when you get into commercial jobs. Not much in residential either but it's a lot less painful when you lose one and they are much easier to replace.
Well i actually plan to go bigger hopefully by next spring, with maybe a 52" mower. He didn't specify about the parking lot or any of that. Mainly he wanted to know how much it would cost to cut the grass, trim..ect.
__________________
My Equipment thread:
http://www.lawnsite.com/showthread.php?t=425995

18 Regualar Accounts
Reply With Quote
  #5  
Old 02-27-2014, 01:56 AM
TPendagast's Avatar
TPendagast TPendagast is offline
LawnSite Gold Member
 
Join Date: May 2008
Location: Wasilla, AK
Posts: 3,655
Quote:
Originally Posted by Sprinkler Buddy View Post
What about the parking lot? Picking up trash, etc... That's a lot of blowing, do they have a parking lot sweeper service?

If I only had a 36" mower with no plans to go bigger, I would pass. If you do decide to go bigger, will you have regrets if they decide to drop you next season? Their isn't much love when you get into commercial jobs. Not much in residential either but it's a lot less painful when you lose one and they are much easier to replace.
You don't have to blow the whole parking lot, just the edges of materials resulting in the grass cutting service…. that's industry standard.

2.5 acres with a 36" on full speed (7mph), 80% efficiency is 74 minutes.

There isn't a lot of trim… be wary of cars… are there curb stops to keep the cars and trucks from overhanging the grass, or can they back up all the way to the curb with their tires and be all up in the grass?

In the worse case scenario I usually say 'tough' vehicles are parked in the way, you get what you get.. I trim as much as possible without breaking a 3 mph pace.

IF you have curb stops and no overhang, easy.

Call it 30 minutes of trim.

you'll have 10 minutes of transport between areas.

10 extra minutes to move truck around

10 minutes of travel.

20 minutes of blow.

So…144 minutes.

That's 2.4 man hours

At $100 per cut, that's a little tight at $41.66/hr
buuuut with a 36" that's pretty fair actually.

if you were to cut this next year with a 52"
your cut time drops to 45 minutes

Brining your over all time to 115 minutes
Brining your average $ per man hour to $52/hr

with a 60" ZTR your mowing time is now 31 minutes
and a total of 101 minutes
Bang…and average of 62.50 per hour…with the same $100 price.

so…to be fair… your $100 price guestimate is RIGHT on the money….

you can't expect to make $60/hr with a 36" mower.

42 is slim net.
52 is better
but 62.50 is pretty sweet.

If it were me, I'd put my foot in the door.
If you get it an you only last one season in something this size…you've lost nothing..
IF you never take the step, you'll never expand.

Plus my times are only averages…can you do it faster with those different mowers including your 36"
If your good?
Yes.

Faster means better $/hr.

I say bid $100 and go for it.
Reply With Quote
  #6  
Old 02-27-2014, 07:08 AM
grassmonkey0311's Avatar
grassmonkey0311 grassmonkey0311 is offline
LawnSite Senior Member
 
Join Date: Feb 2013
Location: MD/NC
Posts: 609
Quote:
Originally Posted by TPendagast View Post
2.5 acres with a 36" on full speed (7mph), 80% efficiency is 74 minutes.
Will the operator be running behind the mower??? 7mph is certainly not walking speed.

My advice is take a pass on it until next year. Just let the guy know you'd love to bid it next go around. Get the experience first. I have passed on 2 commercial properties this year because I am not ready for them. Better safe than sorry...underbidding something like this could really screw you up.
Reply With Quote
  #7  
Old 02-27-2014, 08:48 AM
jrs.landscaping's Avatar
jrs.landscaping jrs.landscaping is online now
LawnSite Silver Member
 
Join Date: Mar 2012
Location: Maine
Posts: 2,392
Quote:
Originally Posted by nashlawn01 View Post
If u could so it with 2 guys in 2 hrs at $100 you would make$25 per hr each before expenses. More like $225 per mow to me. Don't under bid it
Posted via Mobile Device
I'd bid around the same @ 225. Don't forget about trash on the turf that can eat time picking up......
Posted via Mobile Device
Reply With Quote
  #8  
Old 02-27-2014, 09:02 AM
Landrus2's Avatar
Landrus2 Landrus2 is offline
LawnSite Platinum Member
 
Join Date: Dec 2006
Location: Big apple
Posts: 4,693
Who's going to take care of the parking lot
Reply With Quote
  #9  
Old 02-27-2014, 09:29 AM
twomancrew twomancrew is offline
LawnSite Senior Member
 
Join Date: Jun 2013
Location: East, IA
Posts: 950
Whenever some newbie suggest that simply moving to a bigger mower equates to more money per hour I laugh. Bigger mow=bigger trailer=insurance on mower=higher maintenance=stuck in the mud=fuel eating machine=where you gonna store the thing=NO YOU CANNOT USE THE SAME MATH!! DUH! It's like the blind leading the blind.

$100 for that are you kidding?? Try $300.

You could absolutely use a 36" on that. It would get old fast. Is there a difference between a 36" on an acre or a 60" on 2?? They both get it done. Why couldn't you?? Just be certain to price it so when you wear out your WB you have some money to get a bigger unit and cover all the additional expenses. How else do guys like me afford to run 60" mowers all day?
__________________
[/SIGPIC]
Reply With Quote
  #10  
Old 02-27-2014, 10:12 AM
dc33 dc33 is offline
LawnSite Member
 
Join Date: Feb 2006
Location: Indiana
Posts: 165
Quote:
Originally Posted by twomancrew View Post
Whenever some newbie suggest that simply moving to a bigger mower equates to more money per hour I laugh. Bigger mow=bigger trailer=insurance on mower=higher maintenance=stuck in the mud=fuel eating machine=where you gonna store the thing=NO YOU CANNOT USE THE SAME MATH!! DUH! It's like the blind leading the blind.

$100 for that are you kidding?? Try $300.

You could absolutely use a 36" on that. It would get old fast. Is there a difference between a 36" on an acre or a 60" on 2?? They both get it done. Why couldn't you?? Just be certain to price it so when you wear out your WB you have some money to get a bigger unit and cover all the additional expenses. How else do guys like me afford to run 60" mowers all day?

What are you talking about?
A bigger mower equates to marginal increase in expenses. In fact, with say a 72 you will not only cut it in less than half the time, under 1h thus increasing your hourly rate to 100/hr in this case, but you are also putting half the hours on the mower....thus reducing all cost.

The easy way to look at it is mowing a residential 1/2 lot. You might be able to get 2 done in an hour with a 36.....you could easily get 4 done with a 72......doubling your hourly rate
Posted via Mobile Device
Reply With Quote
Reply

Tags
bid , center , price , shopping

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 01:44 PM.

Page generated in 0.08948 seconds with 8 queries