Pricing

I have a bid to do on a residential piece. It is going to take approx. 60 yards of mulch. The owner wants to purchase the mulch and have it delivered and then I would come over and spread it. Most of it will go into large beds without a lot of plants. I can use a small lawn tractor with a trailer to haul it from the pile to the beds. Any ideas on how to price this?????????
__________________
'97 GMC K1500
'05 Hustler SWB 48"
'03 JD GS30 WB 36"
'03 TRAC VAC
'02 JD TRIMMER W/ATTACHMENTS
'02 TORO 21" W/BAGGER
'04 PB 603
'04 HC 150
'04 PAS 260 w/hedge attch.
Reply With Quote
  #2  
Old 03-01-2004, 07:14 PM
bayfish's Avatar
bayfish bayfish is offline
LawnSite Senior Member
 
Join Date: May 2003
Location: Maryland
Posts: 625
Moving mulch that way will be time consuming. I would estimate about 1 hour per yard to spread it times your hourly rate. If there is any bed prep. or edging add that too.
__________________
2005 F250 5.4
2005 F250 6.0 Diesel
2006 F250 6.0 Diesel
2008 F350 Stake body 6.4 Diesel
1992 Chevy 1500
4 Boss snowplows
1 Grasshopper 722D 61"
3 Grasshopper 223 61"
1 Kubota ZD 331 72"
1 Toro 36" W/B
1 Toro 44" W/B
1 Wright Stander 52"
1 Massey Ferguson 1428 Tractor
1 Kubota RTV 1100 diesel with broom
Husqvarna trimmers
Stihl and Redmax blowers
Reply With Quote
  #3  
Old 03-01-2004, 09:26 PM
DJL DJL is offline
LawnSite Member
 
Join Date: Dec 2003
Location: Central New Jersey
Posts: 237
for the labor I'd start at $35/hr/man. If equipment is being used factor that in also.
Reply With Quote
  #4  
Old 03-01-2004, 09:30 PM
MudslinginFX4's Avatar
MudslinginFX4 MudslinginFX4 is offline
LawnSite Bronze Member
 
Join Date: Nov 2003
Location: Raleigh, NC
Posts: 1,170
Wow, your gonna be tired of mulch if your moving it all by yourself. I suggest getting some people to help you and pay them accordingly.
Reply With Quote
  #5  
Old 03-01-2004, 09:46 PM
Flipperneck Flipperneck is offline
LawnSite Member
 
Join Date: Feb 2004
Location: New Brighton, MN
Posts: 164
If I were going to do it I would used two double wheelbarrows and pick up 2 mexicans and pay them $6 per hour 60 X $35 = $2100 2 ten hour days 20 X 2 X 6 = $240 and you are left with $1860 for 2 days work. Thats what I'd do.
Reply With Quote
  #6  
Old 03-01-2004, 10:02 PM
mow2nd's Avatar
mow2nd mow2nd is offline
LawnSite Senior Member
 
Join Date: Feb 2004
Location: Charlotte
Posts: 603
I don't think it takes an hour to spread 1 yard. A yard is only 1 bucket, from a front in loader. I think you could do 4 yards per hour with 2 guys. One year working on a golf course we mulched every bed on the course.......took all winter.

Anyway, You could use wheelbarrels or a small bobcat to move mulch around, then hard racks and pitch forks to spread.

I bet you can knock this out in 20 hours for $1,500-$2,000
Reply With Quote
  #7  
Old 03-01-2004, 11:10 PM
WINGNUT WINGNUT is offline
LawnSite Member
 
Join Date: Jan 2004
Location: Richmond, VA
Posts: 77
THANKS!!!! 'Ya'll's ideas are really helping. I just started in this business and I'm kinda learning by trial and error. My first job so far was 40 yards of mulch. I had to haul it myself (1/2 ton p/u and small trailer) and spread it. I priced it at mulch cost X 2 for total job price. It came to $1500 ( 750 for the mulch and 750 for the labor). I learned a lot off that one!! I think I cut myself a little short on that deal.
__________________
'97 GMC K1500
'05 Hustler SWB 48"
'03 JD GS30 WB 36"
'03 TRAC VAC
'02 JD TRIMMER W/ATTACHMENTS
'02 TORO 21" W/BAGGER
'04 PB 603
'04 HC 150
'04 PAS 260 w/hedge attch.
Reply With Quote
  #8  
Old 03-01-2004, 11:20 PM
JKOOPERS's Avatar
JKOOPERS JKOOPERS is offline
LawnSite Bronze Member
 
Join Date: Nov 2003
Location: O'Fallon, Mo.
Posts: 1,259
mow2nd .
u wanna do all my mulch jobs? Do your homework a yard is not one bucket. It takes about 2 hepping 72" buckets. 60 yards is almost a semi load. With wheelbarrels you are looking at about 4-5 days.
__________________
Turf Equipment Salesman at Heavy Duty Equipment
Reply With Quote
  #9  
Old 03-01-2004, 11:40 PM
WINGNUT WINGNUT is offline
LawnSite Member
 
Join Date: Jan 2004
Location: Richmond, VA
Posts: 77
I hope I figured the yards right. I used the square footage divided by 100 post I saw earlier. The customer said that the last time he bought mulch, it took 2 large dump truck loads. He didn't say if they were tandems or not.
__________________
'97 GMC K1500
'05 Hustler SWB 48"
'03 JD GS30 WB 36"
'03 TRAC VAC
'02 JD TRIMMER W/ATTACHMENTS
'02 TORO 21" W/BAGGER
'04 PB 603
'04 HC 150
'04 PAS 260 w/hedge attch.
Reply With Quote
  #10  
Old 03-01-2004, 11:49 PM
specialtylc specialtylc is offline
LawnSite Bronze Member
 
Join Date: Jan 2004
Location: Washington state, eastsider
Posts: 1,652
Quote:
Originally posted by JKOOPERS
mow2nd .
u wanna do all my mulch jobs? Do your homework a yard is not one bucket. It takes about 2 hepping 72" buckets. 60 yards is almost a semi load. With wheelbarrels you are looking at about 4-5 days.
Thats a pretty small bucket you are using. Around here the bark places use a loader with a 2 yard bucket at least.
__________________
KUBOTA/HUSTLER User
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 12:55 AM.

Page generated in 0.09618 seconds with 7 queries