#31
|
||||
|
||||
|
Quote:
Last edited by M RASCOE&SONS; 01-06-2006 at 08:25 PM. |
|
#32
|
||||
|
||||
|
Sheshovel, I just noticed that in your example you didn’t convert your mulch depth over (one way or another) to feet, rather than inches. Your 9 yards of mulch would be way too much for an area of 10’ x 8’ (80 s.f.).
Instead of multiplying feet by inches 10’ x 8’ x3” lets go with common units, therefore 10’ x 8’ x .25’ or 20 cubic feet. Now convert the 20 cubic feet to cubic yards by dividing by 27 (20 / 27 = .74 cubic yards). So, one yard will do for this small area.
__________________
|
|
#33
|
||||
|
||||
|
OOPS sorry dident catch that my bad.
You know I know how to fiqure out how much mulch I need?I look at the space,don't need to measure anymore,just eyeball it. |
|
#34
|
|||
|
|||
|
So, what if there is already old mulch down? do you rake it a little to freshen it up or clean all the old stuff out or just lay new mulch right over it? and how deep does the mulch need to be?
|
|
#35
|
||||
|
||||
|
Quote:
If you're trying to cover up different colored mulch, you better plan on spreading it a bit on the thick side... probably at least a few inches of it. You may be able to hide it with a thin layer, but as soon as you try to freshen the new mulch you'll uncover the old.
__________________
|
|
#36
|
|||
|
|||
|
no need to take old mulch out unless u have been doing the same landscape for a few years and it is thick(6-7 inches). then just take some out add a little bit of new in with the old let it sit for a day or two then go back and but brand new on top 1.5"-2" thick(total should be about 3-4") just a little tip i found.
__________________
JustinsLawnCare |
|
#37
|
|||
|
|||
|
all these equations are for the perfect world.
Have you asked for only one cubic yard of mulch, but the tractor has a three cubic yard bucket on it. the driver of the tractor scoops about 1/3 of a bucket full and dumps it on your trailer. Or, the tractor has a single cubic yard bucket, and one employee fills that bucket to max capacity spilling mulch everywhere, and the next day a different employee uses the same tractor and bucket, but shakes and bounces that bucket, till you only get the bare minimum out of that bucket. in all three instances you paid for only one cubic yard, but you get three different amounts of mulch. I guess no one has any kidney shaped beds either, they are all perfect squares or rectangles? What about the circular beds with the tree in the center? A good landscaper should know and/or have all the formula's necessary to complete a bid or project or test, but also there is some guesswork involved as well, once you land the job and actually have to get out there and do the work. It sure will eat into that bottom line if you have to go back for one bag or one wheel barrow full of mulch to finish the job.
__________________
What works for me and my crew, may or may not work for you! |
|
#38
|
||||
|
||||
|
no you guys are all screwed up , you will need th square root of pie multiply that by 365 days divided by the -ooops that might be my alimony payment , ill get back to you
|
|
#39
|
||||
|
||||
|
Quote:
__________________
10+ Years professional maintenance experience
|
|
#40
|
||||
|
||||
|
So just how do you figure the area for a circle?
__________________
'99 Craftsman GT w/20hp V-Twin Kohler Pro, Automatic, Modified Triple Blade 50" Deck w/Electric Height Adjustment | '90 Lawn-Boy 21" 2 stroke Self Propelled Commercial Engine Mower | '75 Lawn-Boy 21" 2 stroke Push Commercial Engine Mower | 42" High Speed Lawn Sweeper | 48" Snow/Dozer Blade | 48" Core Aerator | 36" 400lb Lawn Roller | '98 Ryobi 790r 31cc 2 cycle Split-Straight Shaft Trimmer/Edger | Echo PB-200 Blower
|
![]() |
| Bookmarks |
| Tags |
| landscape design, landscaping |
«
Previous Thread
|
Next Thread
»
| Thread Tools | |
| Display Modes | |
|
|












Linear Mode