    What do you all charge for Bush Hog work? We are bidding on two jobs tomorrow for the county, one is 545 acres and the other is 75. The cut will be six times per year with the exception on one area on the 545 acres, 116 every two weeks. It is all flat and grass about 18-24 inches tall. No trees.
     
  2. DND Outdoor

    DND Outdoor LawnSite Member
    Posts: 50

    thats some serious cutting.......Last I checked around here guys were charging $65 or $75 and hour for that kind of tractor work
     
  3. jaybird

    jaybird LawnSite Senior Member
    Posts: 272

    it will go between 6 to 12 dollars per acre
     
  4. Kent Lawn Care

    Kent Lawn Care LawnSite Member
    Posts: 69


    I dont really think i could make money for that price, i average an acre an hour, $65.00 per hour, 2 hour min.

    at least 6-12 would be my cost of the machine and worker there.
     
  5. brentsawyer

    brentsawyer LawnSite Senior Member
    Posts: 663

    An acre per hour, do what, maybe with a 36" WB. I thought this was about bushhogging and 500+ acres. At that rate, when you finish the last acre, you'll be wayyyyy behind on starting over again.
     
  6. naturescaretaker

    naturescaretaker LawnSite Senior Member
    Posts: 851

    Just to let everyone know we did not get the bid ...... yet. We bid it at $49.50 an hour with plans to use a bat-wing 15' cut bush hog. However the person who did win it came in at $18 per hour using a 60" bush hog on a John Deere 755 tractor.

    We were second lowest. I figure that once he starts cutting it he will back out of it and the contract (3 year) will revert to us by default. There is no way he can cut that much with that small of a unit nor be cost effective even if he bought a new tractor. Based on the equipment he is using he would have to work 52 hours per week every week of the year to mow it all. I give it two weeks as he has to start on Tuesday to cut it.
     
  7. brentsawyer

    brentsawyer LawnSite Senior Member
    Posts: 663

    Who's the moron who accepted it. I mean come on, that is by far the dumbest decision I've ever heard of. I'm kind of having a hard time believing that anyone in charge of that much land would let a decision like that go through. He wouldn't be able to keep up even 7 days a week sun up to sun down,.
     
  8. Kent Lawn Care

    Kent Lawn Care LawnSite Member
    Posts: 69


    we are talking about brush hoggin, correct? not cutting a lawn? when someone calls me for brushhogging, im looking at weeds and brush, most of the time 6 foot tall, i dont think you caould get an acre done in an hour with a 36" walker let alone have anything left of it in the end if you do attempt it.
     
  9. naturescaretaker

    naturescaretaker LawnSite Senior Member
    Posts: 851

    There were six of us bidding on this. The other five of us were within penny's of each other. They guy who won the contract runs a dog kennel of all things. Wait until he has to get the insurance and workmens comp with the levels the county requires. Like I said, I give it two weeks.

    I figure that he can do the most 19 acres per 8 hours of run time. That means it will take 28.6 days to complete on 545 acres. That doesn't count the 85 acres to mow every two weeks per the specs on the bid. He can't afford to mow it.

    I can not believe the county actually is giving him a chance. Oh well, life goes on. I expect a call late this coming week.
     
  10. naturescaretaker

    naturescaretaker LawnSite Senior Member
    Posts: 851

    The 545 acres is grass and scrub brush. 18" to 24" tall. They let me take our tractor out there before the bid and run some speed test. I can run 6 mph cutting 15' with the bat wing no problem.
     