civil enginer

Discussion in 'Landscape Architecture and Design' started by raed, Apr 2, 2006.

  1. raed

    raed LawnSite Member
    from nigeria
    Posts: 1

    I have used contractor to lay asphalt for my parking (5000m2) ,and after laying asphalt I have meny cracks .So I want to know how I can solve thise problem and what is causing this problem.
     
  2. EngineeredLawns

    EngineeredLawns LawnSite Member
    Posts: 100

    What kind of cracks appeared, how soon did they appear? what is the sub base and how thick? What kind of drainage work did they do before hand? Unfortunately if the sub base was not done correctly, you can not solve the problem with out removing the asphalt.
     

Share This Page