Dirtman's Picture Thread

Discussion in 'Heavy Equipment & Pavement' started by Dirtman2007, Nov 17, 2008.

  1. JNB Construction

    JNB Construction LawnSite Senior Member
    Posts: 282

    Good looking work Chris. Ya gotta love it when they come in right behind you and shazam...there it is!
     
  2. rvon99

    rvon99 LawnSite Member
    Posts: 56

    Chris What are the going rates an hour for a 200 size excavator, a dozer the size of yours, and a 10 wheel dump truck?
     
  3. Dirtman2007

    Dirtman2007 LawnSite Platinum Member
    Posts: 4,366



    Around here the going rate is $135 a hour for a 20 ton hoe. $100-110 for a Dozer 20Klbs range and a quad runs about $70-75 a hour
     
  4. david bailey

    david bailey LawnSite Member
    Posts: 158

    So what about a mini ex(kubota 161),a trackloader,(takeuchi 140). I have been charging $75 per load on my 750(not hourly) and I adjust on distance and number of loads,$60 to $75 per hr on my B 26 and about the same on my other 2 tractors(grand L,L4400 used for bushhoggong,turf). snow removal is a different animal. If I'm doing a day job i'm charging $750 to $1000 per day depending on variables.(number of guys type of equipment,distance).
     
  5. Dirtman2007

    Dirtman2007 LawnSite Platinum Member
    Posts: 4,366

    Time for a pond update.


    Its mostly done now. I almost had it finished then the owners wanted it deeper so I had to hog more dirt out of the shoreline and build the dam up higher.

    [​IMG]


    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]
     
  6. KrayzKajun

    KrayzKajun LawnSite Fanatic
    Posts: 10,742

    Awesome work on the pond.
    Posted via Mobile Device
     
  7. Bleed Green

    Bleed Green LawnSite Bronze Member
    Posts: 1,514

    Looks great Chris.
     
  8. AEL

    AEL LawnSite Bronze Member
    Posts: 1,724

    is the 210 down or was it on another job? Work looks great as always chris!
     
  9. S-205

    S-205 LawnSite Bronze Member
    from Ontario
    Posts: 1,297

    That pond looks great! Look like a lot of fun work!
     
  10. Dirtman2007

    Dirtman2007 LawnSite Platinum Member
    Posts: 4,366

    yeah the 140 broke down on a job and had to bring out the 210 to finish but then we took it to another pond job we are working on.




    Finished the pond today. lots of straw.


    [​IMG]

    [​IMG]
    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]
     

Share This Page