Field mowing ?

Discussion in 'Lawn Mowing' started by sgallaher, Feb 6, 2006.

  1. sgallaher

    sgallaher LawnSite Senior Member
    Posts: 265

    I am placing a bid to mow down some grassy brush around a residential community. The area is mostly flat and open. There is approx 5-6 acres that have small seedlings growing that are in tubes. The tubes are spaced about 6 feet apart. In this area I plan on using walk behind brush hogs. The rest of the area is about 18 arces of grassy brush that I can use a tractor with pull behind field mower. There are also two dry ponds that will need to be cleared of brush and cat tails. They are about 2-3 acres total in size. How much would you charge for this? I am thinking about 96 man hours total plus equipment charges. I was thinking about $5700. What do you guys think?
     
  2. CutInEdge Lawn Care

    CutInEdge Lawn Care LawnSite Senior Member
    Posts: 677

    At the man hours you specified that is only $59.38/hr with out equipment charge. Or are you charging $20/hr and $39/hr for equipment. However you feel compelled to break it down it's still only $59.38/hr. 5-6 Acres with a walk-behind brush hog?
     
  3. sgallaher

    sgallaher LawnSite Senior Member
    Posts: 265

    Yeah, the 5-6 acres would be with walk behind brush hogs. We will be running 2 of them at a time while 1 guy uses the tractor. Should I charge more? How does $35/man hr $35/equipment hr sound. That would be $6720. This is the largest field mowing job for us, just difficult to figure out how much time to estimate.
     
  4. sgallaher

    sgallaher LawnSite Senior Member
    Posts: 265

    Here are some pics of the area.
    DSC01051.JPG

    DSC01051.JPG

    DSC01059.JPG
     
  5. sgallaher

    sgallaher LawnSite Senior Member
    Posts: 265

    DSC01063.JPG You can see the tubes that we have to mow around DSC01063.JPG

    DSC01063.JPG
     
  6. sgallaher

    sgallaher LawnSite Senior Member
    Posts: 265

    not sure what happend above but here DSC01065.JPG

    DSC01065.JPG
     
  7. sgallaher

    sgallaher LawnSite Senior Member
    Posts: 265

  8. sgallaher

    sgallaher LawnSite Senior Member
    Posts: 265

    Sorry, the computer is not uploading the files.
     
  9. Sammy

    Sammy LawnSite Bronze Member
    Posts: 1,734

    If it is going to take you 96 hours to do the job, then $5700.00 is about right. ..... The bigger question is, why is it going to take you that long ?
     
  10. dcondon

    dcondon LawnSite Silver Member
    Posts: 2,246


    I would say by the looks of all those plastic pipes sticking up. I do agree that it can be done in less time then 96 hrs.
     