1. Missed the live Ask the Expert event?
    Not to worry. Check out the archived thread of the Q&A with Ken Hutcheson, President of U.S. Lawns, and the LawnSite community in the Franchising forum .

    Dismiss Notice

how does this sound?

Discussion in 'Turf Renovation' started by northwest lawn, Apr 13, 2005.

  1. northwest lawn

    northwest lawn LawnSite Member
    Posts: 196

    356 yards of sod installed $3.50 a yard
    8.14 yards of mulch $55.00 a yard installed
    Topsoil 30 yards installed $49.00 per yard
    pea gravel $58.00 for two tons
    plus edging for walkway and two tons of pea gravel dont know how many hours to instal walk way it is 3' wide x 60' long will bid at $35.00 per man hour

    total of bid without labor for walk is $3411.00

    sound right? to high to low? proly think with edging and labor to instal walk way think the bid will be around $4,000.00
    will also have to put in tree rings, and verticle mulch to help with the raised grade will be billed at $35 per man hour

Share This Page