1. Missed the live Ask the Expert event?
    Not to worry. Check out the archived thread of the Q&A with Ken Hutcheson, President of U.S. Lawns, and the LawnSite community on the Franchising Forum.

    Dismiss Notice

how does this sound?

Discussion in 'Turf Renovation' started by northwest lawn, Apr 13, 2005.

  1. northwest lawn

    northwest lawn LawnSite Member
    Posts: 196

    356 yards of sod installed $3.50 a yard
    8.14 yards of mulch $55.00 a yard installed
    Topsoil 30 yards installed $49.00 per yard
    pea gravel $58.00 for two tons
    plus edging for walkway and two tons of pea gravel dont know how many hours to instal walk way it is 3' wide x 60' long will bid at $35.00 per man hour


    total of bid without labor for walk is $3411.00

    sound right? to high to low? proly think with edging and labor to instal walk way think the bid will be around $4,000.00
    will also have to put in tree rings, and verticle mulch to help with the raised grade will be billed at $35 per man hour
     

Share This Page