1. Missed the live Ask the Expert event?
    Not to worry. Check out the archived thread of the Q&A with Ken Hutcheson, President of U.S. Lawns, and the LawnSite community in the Franchising forum .

    Dismiss Notice

How long would it take...

Discussion in 'Landscape Architecture and Design' started by wannago, Sep 25, 2007.

  1. wannago

    wannago LawnSite Member
    Posts: 6

    How long would it take you guys to install roughly 5,000 sq/ft of sod if the area basically needs to be leveled out with some top soil added here and there. Just an estimate b/c i have never done a job this size before.
  2. TXNSLighting

    TXNSLighting LawnSite Fanatic
    from DFW, TX
    Posts: 6,462

    with another guy 4-6 hrsish
  3. Lawnworks

    Lawnworks LawnSite Fanatic
    from usa
    Posts: 5,407

    It will probably blow a whole day for a 2-man crew. Probably take 4-6 man hours in prep time and 10-12 man hours for laying the sod.
  4. wannago

    wannago LawnSite Member
    Posts: 6

    thanks for the response..

Share This Page