Labor rates for retaing walls

Discussion in 'Hardscaping' started by Going Commercial, Oct 1, 2008.

  1. Going Commercial

    Going Commercial LawnSite Member
    Posts: 98

    What is the best way to charge for installing retaing walls. I have no problem with the markup of materials. I am not sure on the labor end. Some jobs I need to bring in the excavator or tractor, some block is obviously alot lighter than others, and so on! Should I be charging by the foot? I recently installed 100ft of versa-loc block 4ft high at my home. I don't know what I should charge if I did it for a customer. Thanks
     
  2. PatriotLandscape

    PatriotLandscape LawnSite Bronze Member
    from MA
    Posts: 1,209

    how long did it take you? how much do you want to pay yourself. your question is too vague
     
  3. amscapes03

    amscapes03 LawnSite Senior Member
    Posts: 398

    How long did the wall at your house take you to build?
     
  4. Going Commercial

    Going Commercial LawnSite Member
    Posts: 98

    I did not keep track of all the time involved. Between the # of trips to get the block and other supplies I really did not pay attention because I was paying not getting paid. I just thought by the size I gave and the type of block I used (465 Versa lock ) someone could give me an idea of what it was worth . Thanks
     
  5. pghlandscape

    pghlandscape LawnSite Member
    from pgh,pa.
    Posts: 61

    12800.00 without grid (30-32 sq ft)
    18000.00 with
     
  6. PatriotLandscape

    PatriotLandscape LawnSite Bronze Member
    from MA
    Posts: 1,209

    4200 for grid. I didn't know it was that expensive.

    Walls here are rarely large enough to use it.
     
  7. Going Commercial

    Going Commercial LawnSite Member
    Posts: 98

    Thanks guys for tne info!
     
  8. mrusk

    mrusk LawnSite Gold Member
    Posts: 3,260

    The grid itself is not the expense. Its everything else involved with building a reinforced srw.

    We rarly use native soils behind a reinforced wall. We always import what is called 'bank run' in new jersey. That way we know we know we will be able to get the right compaction behind the wall.
     
  9. pghlandscape

    pghlandscape LawnSite Member
    from pgh,pa.
    Posts: 61

    the tiered patio is a different job, but the wall had about 2400.00 worth of grid in it, it was engineered @75' long cornering 48' x 5' exposed with 7 versa-lok lights, tiered wall sits 4' back(like i said it was engineered) the picture of the patio and fire pit are the same job total job cost @72,000.00 and it took @ 21 days to complete. the fire pit has gas igniter and crushed glass (1800.00 alone) it is really cool

    pics.jpg

    314256716_1071333804_0.jpg
     
  10. Junior M

    Junior M LawnSite Fanatic
    Posts: 13,541

    I have never been on a retaining wall job that big before and I got one question.. Where did you put all that dirt in that last set of pics? did you haul a little off and stockpile the rest there to backfill as you build? or did you stockpile all of it on the job?
     