New shop - almost complete

Discussion in 'Lawn Mowing' started by Turfdude, Oct 19, 2003.

  1. Turfdude

    Turfdude LawnSite Bronze Member
    Posts: 1,900

    We are anxiously awaiting final inspections of our new facility. We hope to be moving in w/in the next few weeks. This has been a grueling undertaking as we have been working a lot of weekends to get this project complete. The work we have done in house incudes: steel studs, drywall (tape & spackle), insulation, drop ceiling, interior finish, dumpster enclosure, handicap ramp & rail, fencing, landscaping, seeding & sodding. So here's some pics

    Outside

    r0300107.jpg
     
  2. Turfdude

    Turfdude LawnSite Bronze Member
    Posts: 1,900

    more

    r0300108.jpg
     
  3. Turfdude

    Turfdude LawnSite Bronze Member
    Posts: 1,900

    sign

    r0300110.jpg
     
  4. Lazer_Z

    Lazer_Z LawnSite Silver Member
    from NJ
    Posts: 2,579

    Looks nice and good luck with it
     
  5. Turfdude

    Turfdude LawnSite Bronze Member
    Posts: 1,900

    bath

    r0300116.jpg
     
  6. Turfdude

    Turfdude LawnSite Bronze Member
    Posts: 1,900

    back

    r0300112.jpg
     
  7. Turfdude

    Turfdude LawnSite Bronze Member
    Posts: 1,900

    lot

    r0300111.jpg
     
  8. Turfdude

    Turfdude LawnSite Bronze Member
    Posts: 1,900

    inside shop

    r0300114.jpg
     
  9. Turfdude

    Turfdude LawnSite Bronze Member
    Posts: 1,900

    more of shop

    r0300113.jpg
     
  10. Turfdude

    Turfdude LawnSite Bronze Member
    Posts: 1,900

    office

    r0300120.jpg
     

Share This Page