started new project today

Discussion in 'Irrigation' started by greenmonster304, Oct 25, 2012.

  1. Mike Leary

    Mike Leary LawnSite Fanatic
    Posts: 21,917

    The loose wire from below the clock was my question, as was the reason for the galvanized union.
     
  2. greenmonster304

    greenmonster304 LawnSite Gold Member
    Posts: 3,078

    the loose wire is to power the clock as the electrician said he would only provide an outlet not a dedicated circuit. the union is stainless steel.
     
  3. Mike Leary

    Mike Leary LawnSite Fanatic
    Posts: 21,917

    You get a break on the stainless, I would have kicked the electrician's butt for not running conduit to a dedicated circuit. It makes your nice job look like hell with that stupid wire hanging there.
     
  4. SoCalLandscapeMgmt

    SoCalLandscapeMgmt LawnSite Bronze Member
    Posts: 1,805

    just zip tie it to the conduit with the field wiring in it and it will be neat enough.... unless inspector mike drives his twinkie out there to inspect :hammerhead:
     
  5. Mike Leary

    Mike Leary LawnSite Fanatic
    Posts: 21,917

    I meant something like this:

    DSCN0692wminstall.jpg
     
  6. greenmonster304

    greenmonster304 LawnSite Gold Member
    Posts: 3,078

    He was supposed to run the wire for the relay and pump but It would have looked like **** so I wired it all he is just bringing in a feed.
    Posted via Mobile Device
     
  7. cjohn2000

    cjohn2000 LawnSite Senior Member
    Posts: 553

    What kind of pipe is the main? The only thing I could think of is Blulock.
     
  8. greenmonster304

    greenmonster304 LawnSite Gold Member
    Posts: 3,078

    It's 2" PVC
    Posted via Mobile Device
     
  9. Dirt Boy

    Dirt Boy LawnSite Senior Member
    Posts: 487

    no backflow?
     
  10. Wet_Boots

    Wet_Boots LawnSite Fanatic
    Posts: 47,410

    in Suffock County?
     

Share This Page