Storm sewer outlet pipe replacement

Discussion in 'Heavy Equipment & Pavement' started by AEL, Dec 8, 2012.

  1. AEL

    AEL LawnSite Bronze Member
    Posts: 1,725

    Hey guys,

    I just had a large job come across my desk at 5pm on friday and i have to have the tender form in by 11 am monday. The job consists of building a access road , cleaning a large storm water management pond, build a inlet scour pool , armour stone walls, and removal and re instalation of 330 linear feet of 30" storm sewer outlet pipe. Everything on the tender i have done multiple times before except installing storm water pipe. It is re and re so it is not to complicated but i need a general idea of how many linear feet i should be able to do per day, in good conditions and in bad. Excavation is apprx 6' to the top of the pipe, existing pipe bedding is to stay, but new 3/4" crusher run to be installed around and on top of the pipe. Pipe spec is 30" Boss 2000 pipe consisting of 320 kPa stiffness. Also if anyone would have a ball park idea of what i should be charging per linear foot feel free to email or message me so i can compare it to what i have costed it out at.

    I really appreciate any help you guys can give

    Sean
     
  2. KrayzKajun

    KrayzKajun LawnSite Fanatic
    Posts: 10,742

    Sean, ill sent my buddy what you just wrote, he said he will email me back in a few hours a ballpark figure he uses on stuff like this.
    Posted via Mobile Device
     
  3. AEL

    AEL LawnSite Bronze Member
    Posts: 1,725

    Thanks Jacob much appreciated!
    Posted via Mobile Device
     
  4. jmacd

    jmacd LawnSite Member
    Posts: 210

    Will you use a trench box or bench the trench? How far do the spoils need to go? How far is the trucking for importing the new? Do you need to dewater? Compaction of the trench, testing, eroision control, all effects the price.

    Road crossing? Access to the work area? Open trench protection? Is it rate pay Bacon Davis?
     
    Last edited: Dec 9, 2012
  5. AEL

    AEL LawnSite Bronze Member
    Posts: 1,725

    I will bench the trench as it is an open area and lots of room to cast the spoils, there is no access for trucks to come any where near trench with the backfill, i will be transporting it with my 2 tracked carriers travelling about 1200' each way and carrying 4 yards each trip (apprx 8 minutes round trip) , for dewatering i will have multiple pumps from 2"-6" because i am pumping and cleaning the pond in the same time frame. Access to the area is tough because you have to travel through a wet swampy area to get there. No wheeled machines will be coming near this part of the site.

    Thanks!
     
  6. coopers

    coopers LawnSite Bronze Member
    Posts: 1,224

    If you work it, pictures if you have a chance. Sounds like fun.
     
  7. jmacd

    jmacd LawnSite Member
    Posts: 210

    TSS, I don't think a lineal foot price from anyone would be the way I would price this out.

    For what it's worth, probably not much, but my opinion is to price it out this way. Material, plus man and machine time, profit and over head, and subs.

    Brake this into man hours per task, cost of material, and sub work. Add in a CYA factor.

    The guy with the correct equipment, and the most efficient equipment will win this bid.
     
  8. AEL

    AEL LawnSite Bronze Member
    Posts: 1,725

    Thanks J. I figured that due to the various factors of this job I should price it that way . I appreciate the help. I will let you guys know how it goes.

    Regards

    Sean

    Alloa Excavating Ltd
    Posted via Mobile Device
     
  9. KrayzKajun

    KrayzKajun LawnSite Fanatic
    Posts: 10,742

    Sean, sorry i didnt get back to ya. we bben tied up getting this tugboat put in the water and my buddys wife had thier baby sunday night. hope you get this one
     
  10. AEL

    AEL LawnSite Bronze Member
    Posts: 1,725

    Hey Jacob, Unfortunetly didn't win the bid it was lowballed quite a bit. We came second and had quite a few bidders only a very slight margin higher . No worries I have been bidding jobs left right and centre lately . How has work been for you? Positive outlook for next year?
    Posted via Mobile Device
     