What to charge???

Discussion in 'Landscape Architecture and Design' started by boxsky, May 14, 2006.

  1. boxsky

    boxsky LawnSite Member
    Posts: 178

    A customer wants 2" stone to be laid in a bed that is 36x30. it is on a slope and not the easiest to work in. I will be doing this by hand. No heavy equipment. What do I charge? Two to three times the costs of stone or flat rate plus materials. Since this is heavy stone it should take a while to move, rack and level it out.
     
  2. Coffeecraver

    Coffeecraver LawnSite Senior Member
    from VA.
    Posts: 793

    Take a mark-up on the stone and charge the job by the hour
     
  3. topsites

    topsites LawnSite Fanatic
    Posts: 21,653

    Personally, I'd go with materials + delivery fee + hourly rate, figuring roughly an hour labor per cubic yard of stone.
    $30 for the delivery fee or thereabouts.
     

Share This Page