What would you charge for ~4000 sq ft sod job..

Discussion in 'Turf Renovation' started by fastpine, Jul 12, 2010.

  1. fastpine

    fastpine LawnSite Member
    Posts: 201

    ...Assuming its a "normal situation"...Front and backyard...

    With prep including maby half a day of re grading..Also tilling in topsoil..Starter fert,,etc...

    I figure it will take me four trips to the sod farm..

    ..........So, where do you come in at?
     
  2. ajslands

    ajslands LawnSite Silver Member
    Posts: 2,238

    4 trips, with a pallet in your truck? One pallet it's 700 sqft so that means
    that if your hauling in your pickup, you'll need to make 6 trips, maybe 5. Ok so how far do you have to go to the sod farm. I'd just say a 1.75 pr mile one way, then multiply it by 5 or just do like 35$ a trip idc! Are you grading with a skid or by hand?